{"id":"W2012605577","doi":"10.1139/l09-049","title":"Improved genetic algorithm for resource-constrained scheduling of large projects","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"University of Florida","keywords":"Computer science; Scheduling (production processes); Schedule; Mathematical optimization; Genetic algorithm scheduling; Genetic algorithm; Project management; Algorithm; Dynamic priority scheduling; Two-level scheduling; Engineering; Systems engineering; Mathematics; Machine learning","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.003454605,0.0002795936,0.0006830626,0.00166146,0.0001430682,0.0002120865,0.0009804859,0.000178034,0.0001132096],"category_scores_gemma":[0.005599463,0.0002511185,0.0004031614,0.0009764342,0.00007966742,0.0002836219,0.00001904936,0.000433747,0.000002233461],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001366639,"about_ca_system_score_gemma":0.001699884,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007280766,"about_ca_topic_score_gemma":0.002012736,"domain_scores_codex":[0.9965833,0.00006756607,0.001537659,0.000327245,0.0006615472,0.0008227243],"domain_scores_gemma":[0.9965155,0.0007306943,0.0007264794,0.0004157118,0.000781659,0.0008300309],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001341045,0.000135901,0.002187825,0.0001648528,0.0004718089,0.0005320279,0.009833056,0.3347124,0.05217334,0.002512577,0.002228438,0.5949137],"study_design_scores_gemma":[0.003402486,0.001036916,0.002902518,0.0005506028,0.0001116396,0.0009331867,0.002873116,0.9579931,0.006769473,0.001782601,0.02085146,0.0007928839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1131251,0.001485094,0.8822906,0.0005063302,0.000580564,0.0005547724,0.00009288456,0.00002893912,0.001335738],"genre_scores_gemma":[0.8624583,0.000003593192,0.1369414,0.0001146096,0.0003904987,0.000003797663,0.000001810198,0.00003055203,0.00005539542],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7493333,"threshold_uncertainty_score":0.9999941,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.02988674346614349,"score_gpt":0.28485290728277,"score_spread":0.2549661638166265,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}