{"id":"W2046678043","doi":"10.1016/j.ejor.2005.02.077","title":"Integrated production and material handling scheduling using mathematical programming and constraint programming","year":2005,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":128,"is_retracted":false,"has_abstract":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Computer science; Constraint programming; Scheduling (production processes); Job shop scheduling; Mathematical optimization; Resource constraints; Industrial engineering; Stochastic programming; Distributed computing; Mathematics; Engineering; Schedule","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003342187,0.0001118323,0.0001506214,0.0002429863,0.0002472763,0.0004915108,0.00008459437,0.00002922674,0.00004411501],"category_scores_gemma":[0.0006420422,0.00009550195,0.00002386239,0.0001953544,0.0001674677,0.0003543212,0.00003958821,0.0004451465,0.000005400796],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006878485,"about_ca_system_score_gemma":0.00007849489,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":7.88453e-7,"about_ca_topic_score_gemma":5.391744e-7,"domain_scores_codex":[0.9985174,0.0002405379,0.0004542841,0.0001370949,0.0004163664,0.0002343005],"domain_scores_gemma":[0.999106,0.00007129917,0.00005181977,0.00006352145,0.000560439,0.0001468489],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001301785,0.0001516888,0.0004273046,0.0002105308,0.0001766285,0.0001243496,0.003287734,0.5481498,0.05324852,0.001974967,0.00005469042,0.3920636],"study_design_scores_gemma":[0.0007114741,0.0001988757,0.0001584429,0.0007374121,0.00002584085,0.001685788,0.002099561,0.9834367,0.008718951,0.00004754118,0.001922045,0.0002573828],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9018309,0.0004170494,0.09681023,0.0003610855,0.0001757532,0.0001817636,0.000001837559,0.00004465777,0.0001767293],"genre_scores_gemma":[0.5551499,0.00004200099,0.4442716,0.000004892559,0.0004908639,0.000001149748,0.000002372025,0.00002132617,0.0000159408],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4352869,"threshold_uncertainty_score":0.473965,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.06525778728490876,"score_gpt":0.325279648839937,"score_spread":0.2600218615550283,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}