{"id":"W2072148912","doi":"10.3141/1761-16","title":"Critical Path Method–Line of Balance Model for Efficient Scheduling of Repetitive Construction Projects","year":2001,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Critical path method; Scheduling (production processes); Computer science; Schedule; Operations research; Pipeline transport; Path (computing); Industrial engineering; Engineering; Systems engineering; Operations management; Computer network","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001124944,0.001083267,0.0007638223,0.0009840713,0.0005337997,0.000923197,0.0016641,0.0009599303,0.009014987],"category_scores_gemma":[0.001736394,0.0006038581,0.0007536307,0.001265408,0.0006014818,0.00128661,0.0006047762,0.001214611,0.001098762],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001688915,"about_ca_system_score_gemma":0.002726595,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01289307,"about_ca_topic_score_gemma":0.00928446,"domain_scores_codex":[0.9995622,0.0001616432,0.00001236499,0.00005837949,0.0001355266,0.00006986897],"domain_scores_gemma":[0.9995982,0.0002221452,0.00006177497,0.0000162368,0.00007399308,0.00002775365],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001933673,0.00001526994,0.0001055602,0.00003615424,0.000009200749,0.00003278184,0.00002811834,0.962144,0.0004660695,0.02799622,0.001130563,0.008016672],"study_design_scores_gemma":[0.000008163533,0.00002155402,0.00003381804,0.000006240198,0.000003929054,0.00001123327,0.000008037085,0.9895884,0.0001174897,0.008248036,0.001949007,0.00000412838],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.002737118,0.00007551943,0.9933075,0.00007800827,0.00001739586,0.00006598277,0.00009998985,0.0001202194,0.003498373],"genre_scores_gemma":[0.4342998,0.001051312,0.5448695,0.000143165,0.00009106085,0.001365391,0.0007950498,0.0003323018,0.01705251],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01289307,"threshold_uncertainty_score":0.03015816,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.2671081567740019,"score_gpt":0.5032961908038592,"score_spread":0.2361880340298573,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}