{"id":"W2085033196","doi":"10.2118/59128-ms","title":"The Mechanical Earth Model Concept and Its Application to High-Risk Well Construction Projects","year":2000,"lang":"en","type":"article","venue":"","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":262,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Contingency plan; Risk management; Risk analysis (engineering); Geomechanics; Task (project management); Engineering; Construction engineering; Field (mathematics); Computer science; Well control; Systems engineering; Drilling; Business; Computer security","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006952591,0.00008668193,0.00007094823,0.00001898834,0.00008054312,0.00002858553,0.00005409838,0.00004750324,0.00002076076],"category_scores_gemma":[0.000005399717,0.00006686813,0.00001402915,0.00008351337,0.000009730458,0.00005194769,0.000007755549,0.00009552824,0.00008464243],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001060454,"about_ca_system_score_gemma":0.000004326879,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001457725,"about_ca_topic_score_gemma":0.000009928103,"domain_scores_codex":[0.9995461,0.000006100346,0.0001062513,0.0001224799,0.00007185349,0.0001472034],"domain_scores_gemma":[0.9997836,0.00002700903,0.000006892793,0.0001164675,0.00001312535,0.00005292014],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000002675296,0.000001610303,0.000002542781,0.000004607223,0.000007376586,8.727867e-8,0.00006148632,0.9333788,0.001443297,0.009407243,0.00009341955,0.05559685],"study_design_scores_gemma":[0.0001119511,0.00001268407,0.00002267039,0.000005191747,0.000006680169,0.00000358013,0.00001709522,0.9787039,0.01671976,0.0004380587,0.003863727,0.00009467993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4316995,0.00016049,0.5622281,0.00008114779,0.0001302079,0.0003398346,0.000005489405,0.0005781497,0.004777047],"genre_scores_gemma":[0.9945864,0.0003000843,0.004386947,0.00002073527,0.00005790809,0.00003133166,0.000002162965,0.00001787789,0.0005965719],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5628868,"threshold_uncertainty_score":0.2726803,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.004170930427843125,"score_gpt":0.1739309164598334,"score_spread":0.1697599860319902,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}