{"id":"W2086411192","doi":"10.1061/(asce)co.1943-7862.0000722","title":"Fast and Near-Optimum Schedule Optimization for Large-Scale Projects","year":2013,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Computer science; Mathematical optimization; Metaheuristic; Scheduling (production processes); Set (abstract data type); Scale (ratio); Resource (disambiguation); Operations research; Engineering; Algorithm; Mathematics","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001035225,0.0001152049,0.0002146222,0.0003616815,0.000121103,0.0004478473,0.0001225725,0.00004950851,0.00004930467],"category_scores_gemma":[0.0002318015,0.00009170389,0.00006154956,0.0002450882,0.00004905605,0.000483514,0.00005990206,0.0001090776,0.000002346895],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002014518,"about_ca_system_score_gemma":0.0000197884,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001057693,"about_ca_topic_score_gemma":2.63253e-7,"domain_scores_codex":[0.9987315,0.0000243766,0.000512982,0.0001814902,0.0003667892,0.0001828738],"domain_scores_gemma":[0.9990826,0.0001335848,0.0002775056,0.0001213824,0.0002765784,0.0001083141],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004014738,0.00003686029,0.001678205,0.0001403714,0.0001373034,0.0000056677,0.000958625,0.8237261,0.000344541,0.00384652,0.0007240954,0.1683615],"study_design_scores_gemma":[0.001123393,0.0001094959,0.0012181,0.00007490194,0.00004265554,0.0002661945,0.003699161,0.9855927,0.0001181068,0.0003568282,0.007257679,0.0001407452],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.2253766,0.000134738,0.7729629,0.0004610606,0.0003736897,0.0003487809,0.000002066538,0.00002038421,0.0003197731],"genre_scores_gemma":[0.2885453,0.0001033445,0.7110505,0.00003702641,0.0001038407,0.00001808716,6.915012e-7,0.0000118558,0.0001293809],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.1682208,"threshold_uncertainty_score":0.4318602,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01978522260025422,"score_gpt":0.2704363473152965,"score_spread":0.2506511247150423,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}