{"id":"W2089830378","doi":"10.1061/(asce)0733-9364(2005)131:1(42)","title":"Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":82,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Fuzzy logic; Computer science; Relevance (law); Scheduling (production processes); Operations research; Logic model; Industrial engineering; Reliability engineering; Systems engineering; Artificial intelligence; Engineering; Operations management","routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002069254,0.001098256,0.0008912308,0.001954834,0.0008669866,0.002060289,0.002178143,0.001348027,0.004078723],"category_scores_gemma":[0.004420558,0.0006089009,0.001334278,0.001696787,0.0007592852,0.002084326,0.00067681,0.001624983,0.000803953],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003048935,"about_ca_system_score_gemma":0.002652771,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02236094,"about_ca_topic_score_gemma":0.01476621,"domain_scores_codex":[0.9987446,0.0003511422,0.00009064432,0.0002259531,0.0004845291,0.0001030536],"domain_scores_gemma":[0.9985176,0.0008405112,0.000187968,0.00007873307,0.0003284799,0.00004667138],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007367021,0.00006783594,0.0006584354,0.00009607755,0.00005257651,0.0001324639,0.0001768703,0.8530269,0.001432218,0.07841665,0.001067636,0.06479865],"study_design_scores_gemma":[0.00001438968,0.00002894336,0.00009189543,0.000017025,0.0000226428,0.00003277101,0.00002489851,0.9729449,0.0004888176,0.02340824,0.002904394,0.00002112908],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.002790982,0.0001372318,0.9932033,0.0001092333,0.00003376368,0.00004856604,0.00008348515,0.0001516311,0.003441819],"genre_scores_gemma":[0.2926862,0.0009415919,0.6975049,0.0001363644,0.0001465507,0.0003888094,0.0003859063,0.00007588532,0.007733854],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.02236094,"threshold_uncertainty_score":0.04446161,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.0318510078920894,"score_gpt":0.2972117784881596,"score_spread":0.2653607705960702,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}