{"id":"W2089830378","doi":"10.1061/(asce)0733-9364(2005)131:1(42)","title":"Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":82,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Fuzzy logic; Computer science; Relevance (law); Scheduling (production processes); Operations research; Logic model; Industrial engineering; Reliability engineering; Systems engineering; Artificial intelligence; Engineering; Operations management","routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001286649,0.0001133629,0.0002658482,0.001036685,0.0001269568,0.0001927825,0.0001272635,0.00003579475,0.000008354304],"category_scores_gemma":[0.0000910965,0.00009048919,0.0001167236,0.0008012273,0.00005554977,0.0004546432,0.00006945734,0.000104433,5.624285e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003209421,"about_ca_system_score_gemma":0.00001177497,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002735331,"about_ca_topic_score_gemma":0.000001254889,"domain_scores_codex":[0.9988512,0.0000170657,0.000432541,0.000198879,0.0003625301,0.0001377632],"domain_scores_gemma":[0.9992433,0.00006480034,0.000339229,0.0001334849,0.0001473043,0.00007183973],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001251968,0.00006516357,0.009142506,0.0002007017,0.00155186,0.00001027431,0.0002051129,0.2809762,0.0003968343,0.1781401,0.00009139424,0.5290946],"study_design_scores_gemma":[0.01944432,0.00148219,0.2152,0.0003242864,0.007502708,0.003083503,0.01478356,0.5766068,0.003045901,0.09413825,0.06166938,0.002719095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3222414,0.00008614101,0.6760104,0.000174417,0.0002518184,0.0001248752,0.000001457712,0.0000147556,0.001094761],"genre_scores_gemma":[0.7794952,0.0001831484,0.2201646,0.00001990616,0.00006437666,0.000005631892,6.451832e-7,0.000004172335,0.00006240339],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5263755,"threshold_uncertainty_score":0.3690042,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.0318510078920894,"score_gpt":0.2972117784881596,"score_spread":0.2653607705960702,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}