{"id":"W2090065501","doi":"10.1115/ipc2008-64154","title":"Application of Dynamic Programming in Long-Range Pipeline Facility Planning and in Assessing Off-Design and Off-Flow-Forecast Trajectories","year":2008,"lang":"en","type":"article","venue":"","topic":"Water resources management and optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"ca_institutions":"TransCanada (Canada); Nova Chemicals (Canada)","funders":"","keywords":"Sizing; Time horizon; Range (aeronautics); Pipeline (software); Computer science; Dynamic programming; Operations research; Mathematical optimization; Facility location problem; Engineering; Mathematics","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003409375,0.001001594,0.000814151,0.001363139,0.0006191373,0.001843684,0.00107122,0.001275286,0.001539633],"category_scores_gemma":[0.008304413,0.0006988132,0.0007688818,0.001890828,0.001434902,0.001974993,0.001443167,0.00169874,0.0001075389],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002260323,"about_ca_system_score_gemma":0.002630803,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008648833,"about_ca_topic_score_gemma":0.006847791,"domain_scores_codex":[0.9980729,0.001194217,0.00006051666,0.0001913056,0.0003680075,0.0001130628],"domain_scores_gemma":[0.9937709,0.005067233,0.0004657921,0.0001344831,0.0004312287,0.0001303735],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001087243,0.00001354398,0.0004923508,0.00003323534,0.00001757066,0.00002791882,0.00002417325,0.972377,0.0002485532,0.01424791,0.00008823953,0.01241859],"study_design_scores_gemma":[0.000002442747,0.00004189562,0.0002894662,0.00002064251,0.000006525424,0.00001865571,0.00004203128,0.9773145,0.0004180591,0.02100944,0.0008205639,0.00001566702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01669616,0.0004080578,0.9769732,0.0002527033,0.00002980776,0.00008805684,0.00007756314,0.000058289,0.005416193],"genre_scores_gemma":[0.6930325,0.001301984,0.3026348,0.00008185955,0.00004232904,0.0002867776,0.0001410513,0.00006571819,0.002413084],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.008648833,"threshold_uncertainty_score":0.0180307,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01656238788137299,"score_gpt":0.2264186528733748,"score_spread":0.2098562649920018,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}