{"id":"W2097369068","doi":"10.1061/(asce)co.1943-7862.0000483","title":"Heuristic Method for Satisfying Both Deadlines and Resource Constraints","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":28,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Heuristic; Scheduling (production processes); Software; Resource (disambiguation); Process (computing); Set (abstract data type); Operations research; Software engineering; Mathematical optimization; Operating system; Programming language; Artificial intelligence; Engineering","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002089235,0.0008610435,0.0007854556,0.001713091,0.0006375794,0.0009271823,0.001312693,0.0007394961,0.003973196],"category_scores_gemma":[0.00423569,0.0004865584,0.0007973242,0.001345238,0.0005723717,0.0009390398,0.0007466346,0.0008090695,0.0004493986],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009814841,"about_ca_system_score_gemma":0.003389608,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002909281,"about_ca_topic_score_gemma":0.004326142,"domain_scores_codex":[0.9984364,0.0006378267,0.00009932583,0.0001794857,0.0005002313,0.000146634],"domain_scores_gemma":[0.9977977,0.001526239,0.0002138838,0.000117106,0.0002600098,0.00008511538],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001996642,0.000209424,0.0009717512,0.0004618574,0.00009669957,0.0002230485,0.0002580505,0.7271671,0.006815198,0.03707452,0.002957855,0.2235648],"study_design_scores_gemma":[0.0001089796,0.0001758204,0.0002501985,0.00004926874,0.00004457058,0.0001835521,0.00009715855,0.9747505,0.003728036,0.01397645,0.006605307,0.00003022721],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.009493223,0.0001991461,0.9865736,0.00006334636,0.00003466509,0.0002226248,0.00005259151,0.0002451433,0.003115766],"genre_scores_gemma":[0.15276,0.0002525838,0.8447287,0.00005650249,0.00002422904,0.0004577914,0.0001591085,0.00007288616,0.001488236],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.003973196,"threshold_uncertainty_score":0.01329166,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.0693014588953265,"score_gpt":0.3304401048909163,"score_spread":0.2611386459955898,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}