{"id":"W2122351176","doi":"10.1061/(asce)0733-9364(2005)131:2(168)","title":"Graphical Approach for Manpower Planning in Infrastructure Networks","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Computer science; Scheduling (production processes); Operations research; Engineering; Operations management","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001229687,0.0001048367,0.0001429127,0.0003269127,0.00002250915,0.00003152621,0.00004831745,0.00007129173,0.00000500587],"category_scores_gemma":[0.000003811106,0.00009897164,0.00004929337,0.0001371938,0.00001985056,0.0001692957,0.000007367231,0.0001943772,9.458099e-8],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004541494,"about_ca_system_score_gemma":0.000003057991,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":1.491021e-7,"about_ca_topic_score_gemma":1.626883e-7,"domain_scores_codex":[0.9994114,0.000004657443,0.0003030921,0.00007094855,0.00008367452,0.000126212],"domain_scores_gemma":[0.9998083,0.00001266749,0.0000509101,0.00004907303,0.00003158885,0.00004743706],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001381168,0.000004672628,0.0004112368,0.00007183853,0.00005602681,0.000001943994,0.00004217038,0.922058,0.00007476958,0.009662397,0.0004084273,0.06719466],"study_design_scores_gemma":[0.00096788,0.0000331203,0.005037331,0.00009425113,0.00004056817,0.0004298649,0.0003089099,0.9674324,0.00008239676,0.0002117093,0.02519071,0.0001708077],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04903105,0.0007454929,0.9485288,0.00003780331,0.0007079931,0.000115784,7.783087e-7,0.00004935081,0.0007829262],"genre_scores_gemma":[0.8964199,0.0003583312,0.1029014,0.00001502982,0.0002673444,0.00001105673,0.000001765235,0.00001304087,0.00001209198],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.8473889,"threshold_uncertainty_score":0.4035946,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.003422439062006042,"score_gpt":0.1841193441390777,"score_spread":0.1806969050770716,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}