{"id":"W2122351176","doi":"10.1061/(asce)0733-9364(2005)131:2(168)","title":"Graphical Approach for Manpower Planning in Infrastructure Networks","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Computer science; Scheduling (production processes); Operations research; Engineering; Operations management","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00136202,0.001292152,0.0008696305,0.0020037,0.0006983116,0.002405864,0.001606683,0.001223013,0.01125411],"category_scores_gemma":[0.004215552,0.0009065412,0.00173733,0.002212369,0.001379688,0.001861904,0.001315116,0.001592577,0.00172004],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00191942,"about_ca_system_score_gemma":0.001302305,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008085737,"about_ca_topic_score_gemma":0.01281289,"domain_scores_codex":[0.9985446,0.0008899259,0.00005297305,0.0001984234,0.0002263834,0.00008774621],"domain_scores_gemma":[0.9981844,0.001327481,0.0001160048,0.0001159273,0.0001849182,0.0000712656],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00005263963,0.00003032411,0.0003937749,0.0001565014,0.00004241314,0.0002179413,0.0001277403,0.6794468,0.001154802,0.2703146,0.003894418,0.04416813],"study_design_scores_gemma":[0.00001945544,0.00002589966,0.000135566,0.0000286862,0.00001999913,0.00007097235,0.0000401961,0.8428604,0.000505686,0.1454734,0.01079374,0.00002595418],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0008111983,0.0001209005,0.9954031,0.0001186874,0.00002514067,0.00003213008,0.0001042565,0.0001976718,0.003186871],"genre_scores_gemma":[0.1433474,0.001286403,0.8446488,0.0002547042,0.0001521133,0.0005354356,0.000578099,0.000259877,0.008937236],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01125411,"threshold_uncertainty_score":0.03764874,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.003422439062006042,"score_gpt":0.1841193441390777,"score_spread":0.1806969050770716,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}