{"id":"W2127396715","doi":"10.1061/(asce)0733-9364(2003)129:4(396)","title":"Genetic Optimization for Dynamic Project Control","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Schedule; Computer science; Earned value management; Cash flow; Scheduling (production processes); Resource leveling; Genetic algorithm; Project management; Operations research; Project planning; Industrial engineering; Mathematical optimization; Systems engineering; Engineering; Operations management","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001013974,0.0009815983,0.0009388498,0.0006709593,0.000419128,0.00116143,0.001025172,0.001194841,0.003771523],"category_scores_gemma":[0.001960114,0.0003669929,0.0006912127,0.0008963788,0.001302104,0.0008896725,0.0006535063,0.001254954,0.0005443494],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002261251,"about_ca_system_score_gemma":0.001548715,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01070194,"about_ca_topic_score_gemma":0.006390352,"domain_scores_codex":[0.9994687,0.0001912219,0.00001812814,0.00009894234,0.0001586859,0.00006426571],"domain_scores_gemma":[0.9995804,0.0002474523,0.00005377972,0.00002405567,0.00007273981,0.0000216777],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000006180373,0.000008302552,0.00004927205,0.00001058158,0.000008419122,0.00001457655,0.00001153113,0.9512468,0.0001003489,0.043133,0.0003408817,0.005070103],"study_design_scores_gemma":[0.000007087072,0.000008199436,0.00003043681,0.000004108452,0.000003115953,0.0000057765,0.000003571303,0.9717782,0.00004861576,0.02666644,0.001440764,0.000003819796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.004159883,0.0003662719,0.9863511,0.0002702945,0.0000447517,0.00003368408,0.00007031232,0.0001180623,0.008585758],"genre_scores_gemma":[0.7133549,0.001932575,0.2579636,0.0002853767,0.0001307853,0.0007525154,0.0003468459,0.0001445487,0.02508876],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01070194,"threshold_uncertainty_score":0.02127934,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.002866054542077819,"score_gpt":0.1788050161498938,"score_spread":0.175938961607816,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}