{"id":"W2135181737","doi":"10.1061/(asce)co.1943-7862.0000212","title":"Critical Path Segments Scheduling Technique","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Critical path method; Computer science; Path (computing); Scheduling (production processes); Computer network; Operations management; Engineering; Economics; Management","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001178107,0.0008149232,0.0005772015,0.001579565,0.0008497791,0.0008188651,0.001424805,0.0005941273,0.006808138],"category_scores_gemma":[0.002652879,0.0003876357,0.0006385059,0.001626496,0.000750981,0.001166943,0.0008802422,0.001156949,0.001028357],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001028007,"about_ca_system_score_gemma":0.002765979,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003319462,"about_ca_topic_score_gemma":0.002563021,"domain_scores_codex":[0.9989707,0.000256429,0.00005696002,0.0002329064,0.0003630949,0.0001199699],"domain_scores_gemma":[0.9985815,0.0005630863,0.00023392,0.0002106767,0.0003251475,0.00008576614],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0006473118,0.0001748977,0.002492055,0.0004898385,0.0001086816,0.0003429929,0.0007149724,0.2602876,0.03478136,0.1693113,0.01262287,0.5180261],"study_design_scores_gemma":[0.0001744467,0.0008035607,0.001412056,0.0001053593,0.0001001859,0.0005527739,0.0002297954,0.7965106,0.0392957,0.07176937,0.08895628,0.00008974097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.007229076,0.0001502057,0.987371,0.00009862791,0.00006611733,0.0002449894,0.0000753297,0.0005524018,0.004212192],"genre_scores_gemma":[0.3064084,0.0004397517,0.6852815,0.0001239456,0.0001372791,0.000501162,0.0003446355,0.0002720554,0.006491255],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006808138,"threshold_uncertainty_score":0.02277547,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.002922300650782879,"score_gpt":0.1936891978571608,"score_spread":0.1907668972063779,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}