{"id":"W2135726511","doi":"10.1139/l10-108","title":"Scheduling model for repetitive construction processes for high-rise buildings","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Computer science; Industrial engineering; Construction management; Two-level scheduling; Distributed computing; Engineering; Dynamic priority scheduling; Schedule; Operations management; Civil engineering","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00120933,0.0007726078,0.0007235583,0.0005043184,0.000739863,0.001180344,0.001770572,0.001013934,0.00456682],"category_scores_gemma":[0.001481919,0.0004027885,0.001076207,0.0006924133,0.000731774,0.001132541,0.0006190829,0.001166762,0.0007527343],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001792617,"about_ca_system_score_gemma":0.002938176,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01540107,"about_ca_topic_score_gemma":0.009078871,"domain_scores_codex":[0.999275,0.0001697444,0.00003984283,0.0001694655,0.0002174985,0.0001284132],"domain_scores_gemma":[0.9993529,0.0002640787,0.0001375626,0.00004469168,0.0001495438,0.00005126503],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003921556,0.00004084241,0.0002128424,0.00003997307,0.000008847764,0.00007352721,0.00006996345,0.9687118,0.00162906,0.02464052,0.0002638948,0.004269636],"study_design_scores_gemma":[0.00001158715,0.00002341787,0.00006490903,0.000002272327,0.000006199031,0.000009620816,0.00001015378,0.9958734,0.0002826217,0.003293642,0.0004177574,0.000004335561],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03989545,0.0001349437,0.9515989,0.0001928194,0.00005432812,0.0001348687,0.0001396584,0.0002941727,0.007554962],"genre_scores_gemma":[0.8654712,0.0004893497,0.1160385,0.00007283077,0.00005504406,0.0005390434,0.0003781985,0.0001062098,0.01684961],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01540107,"threshold_uncertainty_score":0.03062284,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.006114717840400141,"score_gpt":0.1843259221754707,"score_spread":0.1782112043350706,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}