{"id":"W2139259917","doi":"10.1109/pesmg.2013.6672942","title":"A two-stage framework for power transformer asset maintenance management&amp;#x2014;Part II: Validation results","year":2013,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"ca_institutions":"McGill University","funders":"","keywords":"Reliability engineering; Transformer; Computer science; Time horizon; Asset management; Maintenance engineering; Schedule; Scheduling (production processes); Mathematical optimization; Operations research; Engineering; Voltage; Finance; Mathematics; Electrical engineering; Economics","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001383798,0.0005934892,0.0006688926,0.0003754615,0.0002834425,0.0006227547,0.001525603,0.001029785,0.004532679],"category_scores_gemma":[0.002453699,0.0002422599,0.0005966995,0.0002914651,0.0002956796,0.0006186353,0.0005149286,0.0009292389,0.0003290893],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001031048,"about_ca_system_score_gemma":0.001645017,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02513565,"about_ca_topic_score_gemma":0.01283917,"domain_scores_codex":[0.9996333,0.0001590921,0.00001766815,0.00003870729,0.00009296711,0.00005827684],"domain_scores_gemma":[0.9991637,0.0004706524,0.00006219243,0.00006703756,0.0002087526,0.00002765041],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003013706,0.00006181324,0.0003181365,0.00003242279,0.000007279724,0.00002588954,0.00001022209,0.9897815,0.0006112517,0.003322309,0.0002471471,0.005551882],"study_design_scores_gemma":[0.000009686427,0.00001674939,0.00006659749,0.000002017246,0.000001582476,0.000003640289,0.000003733913,0.9991894,0.0002044053,0.000369607,0.0001308001,0.000001823321],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1022404,0.0003924932,0.8833985,0.0003366077,0.0000507115,0.0003943082,0.0006047009,0.0006533284,0.01192891],"genre_scores_gemma":[0.8279273,0.0001829899,0.1681001,0.00007013979,0.00001749988,0.0004526728,0.0003684812,0.00005334448,0.002827451],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.02513565,"threshold_uncertainty_score":0.04997867,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01540449213333613,"score_gpt":0.2475621498133894,"score_spread":0.2321576576800533,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}