{"id":"W2161995935","doi":"10.5267/j.dsl.2014.5.006","title":"An integrated model for product mix problem and scheduling considering overlapped operations","year":2014,"lang":"en","type":"article","venue":"Decision Science Letters","topic":"Operations Management Techniques","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Computer science; Operations research; Product mix; Product (mathematics); Mathematical optimization; Management science; Industrial engineering; Operations management; Business; Engineering; Mathematics","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001093563,0.001631837,0.0015965,0.001113762,0.0006192529,0.002076334,0.002422048,0.002098535,0.005292435],"category_scores_gemma":[0.001249955,0.0008190821,0.001382762,0.002190232,0.0006184817,0.001771799,0.001236315,0.00165932,0.0007499712],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001855671,"about_ca_system_score_gemma":0.002420601,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00931135,"about_ca_topic_score_gemma":0.006861145,"domain_scores_codex":[0.9992477,0.0001913336,0.00002965961,0.000159552,0.0002315914,0.0001402098],"domain_scores_gemma":[0.9995254,0.0002232324,0.00008815952,0.00002372157,0.00009156629,0.00004799709],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002202549,0.00002950846,0.0001169694,0.00003539239,0.00001146648,0.00004204333,0.00001330239,0.9866763,0.0004422785,0.00829523,0.0002873864,0.004028085],"study_design_scores_gemma":[0.000005396616,0.00001671637,0.00003249483,0.000002496921,0.000005222634,0.000007829792,0.000004053196,0.9979778,0.00007108918,0.001535385,0.0003389238,0.000002640097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02023708,0.0005907765,0.9688764,0.0002497708,0.00006640661,0.0001543642,0.0003177138,0.0002070122,0.009300587],"genre_scores_gemma":[0.7151685,0.001902417,0.2567605,0.0001664795,0.0001501328,0.001282264,0.0009040028,0.0001419584,0.02352374],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.00931135,"threshold_uncertainty_score":0.01851428,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.08489866026449219,"score_gpt":0.3904737767162131,"score_spread":0.305575116451721,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}