{"id":"W2168976754","doi":"10.1080/01446193.2015.1063676","title":"Enhanced heuristic for finance-based scheduling of construction projects","year":2015,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Manitoba","funders":"","keywords":"Scheduling (production processes); Computer science; Integer programming; Payment; Heuristic; Finance; Cash; Job shop scheduling; Linear programming; Cash flow; Operations research; Mathematical optimization; Economics; Engineering; Algorithm; Mathematics; Operating system; Schedule","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009761685,0.0006629264,0.0008943608,0.001091644,0.0003619612,0.000662128,0.001036913,0.0007659858,0.002885462],"category_scores_gemma":[0.001894673,0.0004570383,0.0006798828,0.001041285,0.0004014416,0.0006039252,0.0005718305,0.0006668838,0.0002669967],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001352465,"about_ca_system_score_gemma":0.002325448,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006200449,"about_ca_topic_score_gemma":0.00644827,"domain_scores_codex":[0.9994444,0.0002489395,0.00002371544,0.00006513259,0.0001023175,0.000115497],"domain_scores_gemma":[0.9990422,0.0006571025,0.00007785268,0.00005365601,0.0001008887,0.00006824307],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009449614,0.00009411059,0.0003013768,0.00007492539,0.0000167832,0.00006527174,0.00003780053,0.96751,0.00111904,0.003344661,0.0005652093,0.0267763],"study_design_scores_gemma":[0.00003463611,0.00006134788,0.0001570751,0.000009938432,0.00001004353,0.00002063494,0.00001876426,0.9961118,0.0005919014,0.001858367,0.001119366,0.000006202431],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1322784,0.0006166489,0.8542758,0.0002065462,0.00009214987,0.0005224757,0.0003777971,0.0004698763,0.01116028],"genre_scores_gemma":[0.5227175,0.0003130898,0.4731296,0.00006985525,0.00003130891,0.0004322379,0.0004969977,0.00007684906,0.002732586],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006200449,"threshold_uncertainty_score":0.01232874,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.1135662989238217,"score_gpt":0.3207669187765104,"score_spread":0.2072006198526887,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}