{"id":"W2296568242","doi":"10.1139/cjce-2015-0434","title":"Total float management: computerized technique for construction delay analysis","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"King Abdulaziz City for Science and Technology","keywords":"Software; Computer science; Schedule; Float (project management); Retard; Static timing analysis; Software engineering; Real-time computing; Systems engineering; Embedded system; Engineering; Operating system","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007142489,0.0008358461,0.000347242,0.002400763,0.0004360278,0.0009014253,0.001033954,0.0003585935,0.01299806],"category_scores_gemma":[0.002567203,0.0004477117,0.0004238995,0.001915544,0.0003267094,0.001277277,0.0006298909,0.0005800157,0.002136313],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006443036,"about_ca_system_score_gemma":0.001509296,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004153981,"about_ca_topic_score_gemma":0.005249702,"domain_scores_codex":[0.9993827,0.00006769903,0.00003854337,0.0001201686,0.0003537575,0.00003700217],"domain_scores_gemma":[0.9985298,0.0005519789,0.0002298716,0.0002262819,0.0004240322,0.00003809908],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002135583,0.00008603015,0.006490709,0.0004138132,0.00006974912,0.0001863545,0.0006105556,0.03523531,0.0452258,0.01462744,0.01909058,0.87775],"study_design_scores_gemma":[0.0001320819,0.0004155216,0.01540179,0.0002289521,0.0001622819,0.001412133,0.0004575932,0.6472518,0.118427,0.01836323,0.1975027,0.0002449453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01060724,0.0001379302,0.967328,0.00007231737,0.00004666957,0.0001112164,0.0004904353,0.01563671,0.005569542],"genre_scores_gemma":[0.2107897,0.0003904892,0.77396,0.00006757354,0.00005547703,0.000364044,0.001034862,0.002378743,0.01095917],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.01299806,"threshold_uncertainty_score":0.0434829,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.02147326769624481,"score_gpt":0.2581649152686961,"score_spread":0.2366916475724513,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}