{"id":"W2316255756","doi":"10.1061/40513(279)71","title":"Visual Representation of Project Planning and Control Data","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Project management; Project planning; Scheduling (production processes); Construction management; Control (management); Pre-construction services; Work breakdown structure; Representation (politics); Process (computing); Construction engineering; Systems engineering; Engineering; Civil engineering; Project charter; Artificial intelligence; Operations management; Programming language","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001128103,0.0007597708,0.0004419614,0.002679879,0.0003355417,0.003510165,0.0008095179,0.0006799935,0.008474118],"category_scores_gemma":[0.004494132,0.000381529,0.0004366138,0.002233535,0.0006524356,0.002217007,0.001644083,0.001042853,0.001688312],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006443344,"about_ca_system_score_gemma":0.0009349327,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004698024,"about_ca_topic_score_gemma":0.003202492,"domain_scores_codex":[0.9992896,0.0001937714,0.00005627498,0.00009430589,0.0003077876,0.00005825913],"domain_scores_gemma":[0.9983954,0.0006589355,0.0001200923,0.0003223194,0.0004068673,0.0000963091],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.001153862,0.0002142014,0.003209709,0.001695087,0.0000677109,0.00107235,0.004309988,0.1880804,0.02436307,0.1698787,0.04996193,0.555993],"study_design_scores_gemma":[0.0001399173,0.0002070961,0.003339465,0.0009150687,0.00009339555,0.0009275839,0.00248091,0.4964437,0.03420937,0.1112114,0.3498078,0.0002244129],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01383927,0.0004524301,0.957387,0.0006089086,0.0001479977,0.0002024813,0.004332344,0.004951156,0.01807832],"genre_scores_gemma":[0.3627387,0.001398689,0.6161527,0.0002983356,0.00007330396,0.000671252,0.008917141,0.001394103,0.008355791],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.008474118,"threshold_uncertainty_score":0.02834874,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.02786497181258843,"score_gpt":0.3007425413240152,"score_spread":0.2728775695114267,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}