{"id":"W2324991507","doi":"10.1139/cjce-2013-0232","title":"A novel multiple decision-maker model for resource-constrained project scheduling problems","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Decision maker; Scheduling (production processes); Operations research; Fuzzy logic; Computer science; Particle swarm optimization; Mathematical optimization; Hydropower; Decision model; Project management; Engineering; Systems engineering; Mathematics; Artificial intelligence; Algorithm","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002266629,0.001573908,0.00215558,0.0008799432,0.0008203252,0.00253191,0.003654304,0.002537215,0.00551497],"category_scores_gemma":[0.002481506,0.001162924,0.001728498,0.001891632,0.0009484839,0.00192137,0.001620831,0.003294412,0.0006889871],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001739682,"about_ca_system_score_gemma":0.002664403,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007956227,"about_ca_topic_score_gemma":0.005718579,"domain_scores_codex":[0.9982791,0.0007621667,0.00007404118,0.0002876399,0.0003901623,0.0002068285],"domain_scores_gemma":[0.9989893,0.0005897426,0.0001341451,0.00003643514,0.0001554596,0.00009507272],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002299025,0.0000266142,0.0001556083,0.00005279083,0.00002900619,0.00009731793,0.0000356706,0.9751267,0.0003698679,0.0207862,0.0003422471,0.002954937],"study_design_scores_gemma":[0.000009646758,0.00001284714,0.0000263325,0.000003185863,0.000005455078,0.00001035914,0.00000673751,0.9964136,0.00005510958,0.003022784,0.0004286935,0.000005144369],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.00662811,0.0002308288,0.9876435,0.0002915098,0.00006444805,0.0000802391,0.0001378074,0.00008641119,0.004837203],"genre_scores_gemma":[0.6672194,0.001349577,0.3108786,0.0002314931,0.0001675368,0.001108246,0.0004814629,0.0001166262,0.018447],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.007956227,"threshold_uncertainty_score":0.01844943,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.0623820146616056,"score_gpt":0.2923770470866613,"score_spread":0.2299950324250558,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}