{"id":"W2334836146","doi":"10.2316/journal.203.2011.2.203-4496","title":"PROFIT–BASED UNIT COMMITMENT PROBLEM WITH BILATERAL CONTRACTS","year":2011,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Power system simulation; Mathematical optimization; Profit (economics); Linear programming; Integer programming; Computer science; Binary number; Dual (grammatical number); Unit (ring theory); Operations research; Power (physics); Electric power system; Economics; Mathematics; Microeconomics","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001801846,0.0001253668,0.0001841811,0.0002126857,0.00001905293,0.00006651999,0.0001748771,0.00005223301,0.00001984533],"category_scores_gemma":[0.000004299667,0.00009201842,0.00003467263,0.00007736056,0.00001764724,0.0002307914,0.000008505116,0.00008944633,0.000001595407],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007560707,"about_ca_system_score_gemma":0.00003925949,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001035333,"about_ca_topic_score_gemma":0.000008845162,"domain_scores_codex":[0.9990315,0.0000391567,0.0003997237,0.00007381282,0.0003234128,0.0001323764],"domain_scores_gemma":[0.9992794,0.00002436624,0.000179872,0.00007240699,0.0003553665,0.00008852631],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.002111114,0.0007251515,0.1299678,0.0004090752,0.007489179,0.002515804,0.00981157,0.7795448,0.006218755,0.04415043,0.008585501,0.008470831],"study_design_scores_gemma":[0.02756485,0.006821415,0.05281981,0.007138372,0.0005947327,0.01510733,0.00164687,0.6166682,0.03024708,0.0007243307,0.2370404,0.003626612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.306174,0.004495841,0.5798391,0.000317751,0.01057286,0.0004483183,0.0000344556,0.0003158022,0.09780198],"genre_scores_gemma":[0.9985865,0.00003176674,0.001008707,0.00003526202,0.0001002134,0.000008670323,0.000004190939,0.00002220016,0.00020249],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6924126,"threshold_uncertainty_score":0.3752402,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01026511340919721,"score_gpt":0.1909960287381717,"score_spread":0.1807309153289745,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}