{"id":"W2348077593","doi":"","title":"Strengthen engineering budget management of construction unit is the effective way to control engineering cost","year":2002,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Diathesis; Unit (ring theory); Control (management); Cost engineering; Cost control; Project management; Engineering; Construction engineering; Engineering management; Risk analysis (engineering); Operations management; Computer science; Cost estimate; Business; Systems engineering; Medicine","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001421008,0.0001404091,0.0001445035,0.000119573,0.00003145978,0.00002457449,0.000115346,0.00004364609,0.0006290486],"category_scores_gemma":[0.00001664853,0.0001220178,0.00004833082,0.0002908759,0.00001068659,0.00008835706,0.00001827156,0.00009127415,0.00006480676],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004817192,"about_ca_system_score_gemma":9.397144e-7,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002495287,"about_ca_topic_score_gemma":7.766067e-7,"domain_scores_codex":[0.9992826,0.00001402212,0.0002273976,0.0001212663,0.000184337,0.0001704011],"domain_scores_gemma":[0.9995395,0.00009767289,0.00002233268,0.0002062228,0.00006934702,0.00006495895],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000002135301,0.000006831724,0.0000236343,0.00004971775,0.0001135642,4.692627e-7,0.0002918903,0.978254,0.0002348545,0.006872405,0.0004140307,0.01373643],"study_design_scores_gemma":[0.0005499893,0.00001579318,0.0008052691,0.00004002584,0.00003779988,0.000002008088,0.0000949174,0.9945093,0.001979248,0.00001374052,0.001815057,0.0001368274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01810484,0.0001032696,0.9725402,0.0003277379,0.0003073669,0.001040336,0.00001914372,0.0003461699,0.007210949],"genre_scores_gemma":[0.9824706,0.0000608544,0.01691655,0.0001290072,0.00003311101,0.0001292878,0.000003349363,0.00003154565,0.0002256761],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9643658,"threshold_uncertainty_score":0.6887642,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01166421615812671,"score_gpt":0.2085347358549225,"score_spread":0.1968705196967958,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}