{"id":"W2393105121","doi":"","title":"Reliability Based Method for Spare Planning of Power System Equipment","year":2006,"lang":"en","type":"article","venue":"Proceedings of the CSEE","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Spare part; Reliability engineering; Reliability (semiconductor); Probabilistic logic; Term (time); Engineering; Computer science; Operations research; Power (physics); Operations management","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001120862,0.0009615903,0.0006746051,0.001892371,0.0003714294,0.0005893585,0.001369054,0.0005670265,0.008163666],"category_scores_gemma":[0.003189713,0.0005530127,0.001051541,0.00102734,0.0004587915,0.0007796873,0.000548028,0.001088831,0.001831741],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008444171,"about_ca_system_score_gemma":0.001053243,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003355966,"about_ca_topic_score_gemma":0.003122964,"domain_scores_codex":[0.9991375,0.0002610711,0.00003024931,0.0001112313,0.000414272,0.00004564892],"domain_scores_gemma":[0.9989998,0.0006035703,0.00006933495,0.0000977429,0.0002068454,0.00002271001],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006929911,0.00004031763,0.0003414026,0.0002310962,0.000057988,0.0001223296,0.0001090284,0.7121148,0.005090421,0.04532462,0.003375737,0.233123],"study_design_scores_gemma":[0.00001651758,0.00004442268,0.0001665605,0.00002993142,0.00002289592,0.0001187599,0.00001031445,0.9711926,0.00204366,0.01671725,0.009617552,0.00001947564],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.000696089,0.00007238684,0.9976391,0.0000153825,0.00001392706,0.00002629585,0.00004094856,0.0002271639,0.001268875],"genre_scores_gemma":[0.06793265,0.0002710763,0.9274967,0.00003804043,0.00004515268,0.0002723167,0.0002820517,0.0003181073,0.003343779],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.008163666,"threshold_uncertainty_score":0.02731019,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.008152119526067954,"score_gpt":0.2229180896212141,"score_spread":0.2147659700951461,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}