{"id":"W2504132119","doi":"10.1155/2016/2312057","title":"An Integrated Expert System for Linear Scheduling Heavy Earthmoving Operations","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Scheduling (production processes); Schedule; Operations research; Parametric statistics; Randomness; Conceptual design; Industrial engineering; Engineering; Computer science; Systems engineering; Operations management","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009328587,0.0006524576,0.0005990763,0.0006718062,0.000434628,0.0008244252,0.001100965,0.0008632684,0.008391183],"category_scores_gemma":[0.002507594,0.0003565776,0.000368723,0.000382998,0.0001805095,0.0006072552,0.0006076417,0.0005988348,0.001382057],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005361545,"about_ca_system_score_gemma":0.001496328,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004244579,"about_ca_topic_score_gemma":0.005526939,"domain_scores_codex":[0.9995172,0.00008844949,0.00004952845,0.0001617852,0.0001379931,0.00004506091],"domain_scores_gemma":[0.9990796,0.0003603769,0.00007998536,0.0001075501,0.0003136105,0.00005880246],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0006262047,0.0004842605,0.002421272,0.0003189714,0.00008796444,0.0004931528,0.0004056193,0.4282941,0.05145511,0.005467996,0.008301876,0.5016434],"study_design_scores_gemma":[0.00006059274,0.00008458904,0.0004995501,0.00001771029,0.00002933479,0.00006998441,0.00004762201,0.9886907,0.004885345,0.001220991,0.004375976,0.00001756094],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01893536,0.00005393411,0.9707124,0.00005404702,0.00002549906,0.0001935594,0.0002397135,0.005871687,0.003913754],"genre_scores_gemma":[0.3018778,0.0001065096,0.6923855,0.00007768263,0.00002085797,0.0004068688,0.0005588974,0.0001625624,0.004403267],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.008391183,"threshold_uncertainty_score":0.02807128,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.008098464830622399,"score_gpt":0.2172555379556571,"score_spread":0.2091570731250346,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}