{"id":"W2531535670","doi":"10.5539/mas.v11n1p48","title":"The Importance and Use of Risk Management in Various Stages of Construction Projects Life Cycle (PLC)","year":2016,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Risk analysis (engineering); Process (computing); Risk management; Business; Product life-cycle management; Balance (ability); Construction management; Process management; Order (exchange); Risk management plan; Operations management; Computer science; IT risk management; Engineering; Marketing; Civil engineering; Finance","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006511731,0.0005313663,0.0002513099,0.003094619,0.001109224,0.004682083,0.0006651449,0.0007179853,0.001237375],"category_scores_gemma":[0.01471372,0.0003910554,0.0004909442,0.001770194,0.00141233,0.003346474,0.002043201,0.0008551585,0.00027584],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001905191,"about_ca_system_score_gemma":0.003397323,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001726112,"about_ca_topic_score_gemma":0.002334934,"domain_scores_codex":[0.9922018,0.003719186,0.0007743884,0.0004474294,0.002464912,0.0003922931],"domain_scores_gemma":[0.9852766,0.006845063,0.003522156,0.0009494497,0.002933132,0.0004735745],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0002374154,0.0002794988,0.1196774,0.001203521,0.0001076862,0.001053984,0.03325946,0.01439861,0.01503757,0.07531039,0.001982116,0.7374524],"study_design_scores_gemma":[0.00004624783,0.00204248,0.4720892,0.00473534,0.000520687,0.007821845,0.07782507,0.0762722,0.03674059,0.1317379,0.1894302,0.0007382378],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5664999,0.005041655,0.3233511,0.003451675,0.0001076882,0.0008686036,0.0002708861,0.0005317514,0.0998765],"genre_scores_gemma":[0.9220244,0.001177347,0.07353403,0.00006815049,0.0000192672,0.0001580478,0.00008519185,0.00003672795,0.002896759],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.006511731,"threshold_uncertainty_score":0.03443778,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.00972740312757443,"score_gpt":0.2021196966113639,"score_spread":0.1923922934837895,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}