{"id":"W2726377482","doi":"10.1504/ijids.2017.10005874","title":"A new model for estimation of project total cost in construction projects","year":2017,"lang":"en","type":"article","venue":"International Journal of Information and Decision Sciences","topic":"Value Engineering and Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Estimation; Cost estimate; Computer science; Project management; Cost overrun; Business; Operations management; Operations research; Construction industry; Construction engineering; Economics; Systems engineering; Mathematics; Engineering","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001838335,0.001243713,0.001325494,0.001945912,0.0005472035,0.002924106,0.003583678,0.002443074,0.004290147],"category_scores_gemma":[0.003945774,0.0008715513,0.001332532,0.00274444,0.0007452322,0.003019505,0.001290101,0.001872048,0.0005433283],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002344615,"about_ca_system_score_gemma":0.002147184,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01784942,"about_ca_topic_score_gemma":0.01099748,"domain_scores_codex":[0.9984123,0.0004361675,0.0001060358,0.0003745018,0.0004914258,0.0001796287],"domain_scores_gemma":[0.9990094,0.0004576018,0.0001693575,0.00004693371,0.0002785212,0.00003821397],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000135457,0.00001168612,0.0003052796,0.00004558373,0.00001524712,0.00006932933,0.00002684907,0.978542,0.0002361877,0.01406445,0.0003409807,0.006328856],"study_design_scores_gemma":[0.000003027995,0.000007770518,0.0001152923,0.000008045551,0.000007328192,0.00002033709,0.000007919782,0.9960105,0.00007880819,0.003081385,0.0006519079,0.000007597576],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.009990984,0.0003941217,0.9842095,0.0002362387,0.00005679806,0.0000634038,0.0002908281,0.0001378506,0.004620137],"genre_scores_gemma":[0.7815557,0.002112082,0.1927421,0.0001016594,0.0001458988,0.0008976547,0.001077289,0.0001712609,0.02119633],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01784942,"threshold_uncertainty_score":0.03549105,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.04863599112512881,"score_gpt":0.3360817655156728,"score_spread":0.287445774390544,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}