{"id":"W2742418309","doi":"10.5539/mas.v11n9p20","title":"An Optimization Approach to the Preventive Maintenance Planning Process","year":2017,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Computer science; Mathematical optimization; Schedule; Scheduling (production processes); Preventive maintenance; Solver; Job shop scheduling; Task (project management); Operations research; Reliability engineering; Mathematics","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005879766,0.0001139182,0.00009461443,0.00004826369,0.0009030061,0.0004155963,0.001116631,0.00003620408,0.000002259051],"category_scores_gemma":[0.00008489862,0.00008368061,0.00001491146,0.0001919814,0.0002625822,0.0006251038,0.00006482815,0.0001101938,0.000005641071],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006796212,"about_ca_system_score_gemma":0.00004001079,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003321737,"about_ca_topic_score_gemma":0.000001487655,"domain_scores_codex":[0.9989157,0.000006294155,0.0001240769,0.0003546147,0.0002776446,0.0003216561],"domain_scores_gemma":[0.9990296,0.000008744021,0.00005232908,0.000722087,0.00009317281,0.0000940255],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00000686921,0.00001754102,0.00002687453,0.00001312515,0.000001559892,1.211357e-7,0.00239431,0.9907158,0.003051652,0.0009507221,0.00003704547,0.002784355],"study_design_scores_gemma":[0.00008858841,0.000009326714,0.0005785685,0.00001601304,0.000003096553,0.000001147464,0.0002581412,0.9964272,0.001501749,0.0009467565,0.00004222759,0.0001272361],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.009839743,0.000008091546,0.9463059,0.00007843683,0.0001164702,0.0004683557,0.000002239075,0.0001327811,0.04304798],"genre_scores_gemma":[0.9520059,0.000004536878,0.04766637,0.00006490325,0.00004042782,0.0001397281,0.000003124769,0.00001501188,0.00005994858],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9421662,"threshold_uncertainty_score":0.6945283,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01337900823869963,"score_gpt":0.2574609788941941,"score_spread":0.2440819706554945,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}