{"id":"W2754068171","doi":"","title":"Mass Transit: Toronto Plans Network of Light-Rail Systems","year":2007,"lang":"en","type":"article","venue":"Civil engineering","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"ca_institutions":"","funders":"","keywords":"Light rail transit; Transport engineering; Transit (satellite); Light rail; Transit system; Rail transit; Rapid transit; Mass transportation; Public transport; Engineering; Civil engineering; Business","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004757413,0.00006218153,0.000105279,0.00001867195,0.00007547571,0.00001604542,0.00007970569,0.00007498892,0.00003394278],"category_scores_gemma":[0.00001849465,0.00006849598,0.00003139292,0.0001369887,0.00001144409,0.0001260967,9.66533e-7,0.00004565073,0.00000189699],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005605723,"about_ca_system_score_gemma":0.00002411896,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007201165,"about_ca_topic_score_gemma":0.007998051,"domain_scores_codex":[0.9993225,0.00001061975,0.000187558,0.00008457369,0.0001779966,0.0002167083],"domain_scores_gemma":[0.9997185,0.00006153489,0.00003943533,0.0000652809,0.00004424477,0.00007097296],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000006308876,0.00000645311,0.002921664,0.00004309618,0.00001556778,0.00000431885,0.008912899,0.9701707,0.0005472925,0.01688333,0.0003112505,0.0001770899],"study_design_scores_gemma":[0.002836369,0.0002467942,0.1496724,0.002022804,0.0002724984,0.000007221208,0.03400232,0.1465482,0.002388968,0.0002573263,0.6593295,0.002415643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01709126,0.001612112,0.9122677,0.0000707813,0.001599228,0.0001818235,0.00001031346,0.0003076596,0.0668591],"genre_scores_gemma":[0.9980817,0.00005283469,0.001296029,0.00000589868,0.000294073,0.000002558579,0.000009395599,0.00001023552,0.0002472917],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9809904,"threshold_uncertainty_score":0.44631,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.00779878824709195,"score_gpt":0.2235972721957525,"score_spread":0.2157984839486606,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}