{"id":"W2896702585","doi":"10.2478/mape-2018-0027","title":"Applying the Anticipatory Failure Determination at a Very Early Stage of a System’S Development: Overview and Case Study","year":2018,"lang":"en","type":"article","venue":"Multidisciplinary Aspects of Production Engineering","topic":"Technology Assessment and Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"Independent Electricity System Operator; Uniwersytet Szczeciński","keywords":"Hull; Process (computing); Set (abstract data type); Computer science; TRIZ; Reliability engineering; Systems engineering; Stage (stratigraphy); Engineering; Operations research; Industrial engineering; Artificial intelligence","routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003214622,0.000696599,0.0005454178,0.002163436,0.00086154,0.00137228,0.001214744,0.001755838,0.001168076],"category_scores_gemma":[0.004923328,0.0003591229,0.000745825,0.001342748,0.001150322,0.0008972274,0.001268165,0.0009437339,0.000227266],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001220157,"about_ca_system_score_gemma":0.0008720576,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004431232,"about_ca_topic_score_gemma":0.003280358,"domain_scores_codex":[0.9970365,0.001548944,0.0002001454,0.0002230955,0.0006791676,0.0003121855],"domain_scores_gemma":[0.9948373,0.003316002,0.0004703163,0.0004938502,0.0006648228,0.0002175408],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.002102001,0.004753337,0.1131435,0.002946699,0.0002417973,0.04102584,0.01367973,0.3255578,0.0481215,0.03056186,0.003676767,0.4141892],"study_design_scores_gemma":[0.0004154234,0.01138431,0.08304947,0.0008139236,0.0003896647,0.01548753,0.01621536,0.7086185,0.1149437,0.01598788,0.03217655,0.0005178401],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8907551,0.000806973,0.09896049,0.0003107875,0.00003033434,0.0006249413,0.0001685353,0.0002382347,0.008104521],"genre_scores_gemma":[0.9667623,0.0004368887,0.03151224,0.00002067758,0.00001036541,0.0001231282,0.00004926787,0.00001457192,0.001070508],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.004431232,"threshold_uncertainty_score":0.01700079,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.02060407265858838,"score_gpt":0.2607465465149018,"score_spread":0.2401424738563134,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}