{"id":"W2973018720","doi":"10.1142/s0219686720500031","title":"An Integrated Multi-Period Layout Planning and Scheduling Model for Sustainable Reconfigurable Manufacturing Systems","year":2019,"lang":"en","type":"article","venue":"Journal of Advanced Manufacturing Systems","topic":"Flexible and Reconfigurable Manufacturing Systems","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"ca_institutions":"Concordia University","funders":"","keywords":"Time horizon; Control reconfiguration; Scheduling (production processes); Mathematical optimization; Volatility (finance); Computer science; Energy consumption; Industrial engineering; Engineering; Economics; Mathematics; Econometrics; Embedded system","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006786676,0.001002028,0.001076522,0.0007786267,0.0004326926,0.001229691,0.001342206,0.001593918,0.005080871],"category_scores_gemma":[0.001086105,0.0008225893,0.001084345,0.001263834,0.0005516559,0.0005981812,0.0005944847,0.0009038864,0.0004135778],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00160646,"about_ca_system_score_gemma":0.001832078,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01558721,"about_ca_topic_score_gemma":0.01501134,"domain_scores_codex":[0.9995878,0.0001456725,0.00001228915,0.00007973771,0.00008199142,0.00009245036],"domain_scores_gemma":[0.9996272,0.0001929369,0.0000741319,0.00001710242,0.00005401797,0.00003456744],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000009602537,0.000005890769,0.00005321488,0.00001281806,0.000005169441,0.00001967672,0.000005329891,0.9978088,0.0001304534,0.00100225,0.00008384676,0.0008630349],"study_design_scores_gemma":[0.000005331524,0.00001067361,0.00005610951,0.000002613587,0.000004182008,0.000005974943,0.000004678948,0.9991087,0.00005012171,0.0005184664,0.0002307013,0.00000234682],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08788734,0.001115771,0.8811058,0.0006206957,0.000127447,0.0002437049,0.001168016,0.0006303302,0.02710104],"genre_scores_gemma":[0.8687561,0.0007646627,0.1134628,0.0001134649,0.00003893254,0.0005718281,0.0005969497,0.0001093333,0.01558595],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01558721,"threshold_uncertainty_score":0.03099298,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01429901056168262,"score_gpt":0.2445620488164806,"score_spread":0.2302630382547979,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}