{"id":"W3004887747","doi":"10.1142/s0218539320400100","title":"Development of an Operational Adequacy Evaluation Framework for Operational Planning of Bulk Electric Power Systems","year":2020,"lang":"en","type":"article","venue":"International Journal of Reliability Quality and Safety Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Operational planning; Time horizon; Electric power system; Operational risk; Operational costs; Computer science; Reliability engineering; Operational efficiency; Probabilistic logic; Operations research; Systems engineering; Risk analysis (engineering); Engineering; Power (physics); Risk management","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003156812,0.0001637161,0.00044059,0.00012098,0.00004151182,0.0000379392,0.000299898,0.0001347266,0.0000181771],"category_scores_gemma":[0.002192375,0.0001586072,0.0001155058,0.0001290224,0.00002853804,0.0004300213,0.00003041055,0.0002582239,4.498047e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002239865,"about_ca_system_score_gemma":0.0002629356,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004832652,"about_ca_topic_score_gemma":5.209066e-7,"domain_scores_codex":[0.9971622,0.00007837355,0.001595835,0.0001795358,0.0008342745,0.000149811],"domain_scores_gemma":[0.9974247,0.0006300265,0.0003130122,0.000124288,0.001379034,0.0001289436],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003112472,0.00006970305,0.0003191784,0.0005601977,0.0002190481,9.38706e-7,0.003411924,0.9662503,0.01319637,0.01468429,0.00001874617,0.0009580848],"study_design_scores_gemma":[0.001644602,0.0002827495,0.01187778,0.0008359352,0.00005006783,0.00003625334,0.0007385011,0.9670273,0.01150668,0.001125471,0.00450555,0.0003691115],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4421114,0.0005574172,0.5559691,0.0003048642,0.0007040991,0.0002536795,0.0000446895,0.00002037631,0.0000344086],"genre_scores_gemma":[0.9433697,0.00002990655,0.05636029,0.00003666697,0.0001460334,0.00001573657,0.00002447827,0.00001558089,0.000001587379],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5012584,"threshold_uncertainty_score":0.6467813,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.03697942691283389,"score_gpt":0.3156163450507817,"score_spread":0.2786369181379478,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}