{"id":"W3080168217","doi":"10.29173/ijic215","title":"Planning semi-automated precast production using GA","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Tardiness; Production planning; Production line; Production (economics); Scheduling (production processes); Schedule; Computer science; Job shop scheduling; Industrial engineering; Real-time computing; Engineering; Operations research; Operations management; Civil engineering; Operating system","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001749474,0.0001188763,0.0001853316,0.0002098728,0.00004012804,0.00009714218,0.0001711948,0.0001263159,0.00007718085],"category_scores_gemma":[0.0003724184,0.0001210899,0.00007823593,0.0002556698,0.00003708827,0.0003959691,0.00001492109,0.0003315651,0.00000451529],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001444641,"about_ca_system_score_gemma":0.00008511021,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002825388,"about_ca_topic_score_gemma":7.458104e-8,"domain_scores_codex":[0.9987984,0.00004623611,0.0005651126,0.0001030305,0.000381773,0.000105477],"domain_scores_gemma":[0.9990427,0.00002484728,0.000307286,0.00004988614,0.0004752742,0.0001000013],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001570132,0.000008889983,0.0006930839,0.000005297657,0.0002336627,0.00002149562,0.0003136228,0.9795278,0.008969423,0.00002784257,0.0008683802,0.00917348],"study_design_scores_gemma":[0.001919265,0.000047765,0.00005394443,0.0001844704,0.00005954516,0.001090119,0.0006067684,0.9726207,0.02171972,0.00003962947,0.001485242,0.0001727806],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8217542,0.0002171095,0.1581934,0.001178647,0.01747065,0.0001565328,0.00001366556,0.0005976883,0.0004180918],"genre_scores_gemma":[0.9442989,0.00003861998,0.05156627,0.00006714068,0.003979465,0.000001318758,0.00001183262,0.0000288779,0.000007624852],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1225447,"threshold_uncertainty_score":0.4937901,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.05524105237403548,"score_gpt":0.2919254342536463,"score_spread":0.2366843818796108,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}