{"id":"W3080168217","doi":"10.29173/ijic215","title":"Planning semi-automated precast production using GA","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Tardiness; Production planning; Production line; Production (economics); Scheduling (production processes); Schedule; Computer science; Job shop scheduling; Industrial engineering; Real-time computing; Engineering; Operations research; Operations management; Civil engineering; Operating system","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003827649,0.0007695701,0.0007098304,0.0005617196,0.0003877532,0.0005692399,0.0007504799,0.0006607276,0.001845522],"category_scores_gemma":[0.0007607623,0.0004139628,0.0007416769,0.0005523712,0.0005044871,0.0004015075,0.0004412222,0.000506598,0.0001863645],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005485849,"about_ca_system_score_gemma":0.001401282,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008868856,"about_ca_topic_score_gemma":0.006490252,"domain_scores_codex":[0.999739,0.00008121728,0.00001159073,0.00005522262,0.00006652796,0.00004652392],"domain_scores_gemma":[0.9996785,0.0001874331,0.00003760108,0.00002857333,0.00005205012,0.00001578469],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000163293,0.00001340559,0.0001768526,0.00002980832,0.00001032331,0.00003498208,0.00001799059,0.9856032,0.001379441,0.001503097,0.0001564009,0.01105816],"study_design_scores_gemma":[0.00000650673,0.00002557866,0.00008263854,0.000004378363,0.000005272035,0.00001260719,0.00001064105,0.9972621,0.0006806423,0.001487325,0.0004183764,0.00000394693],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06106136,0.0002038157,0.9336983,0.00009246914,0.00003146506,0.0001055051,0.00009671903,0.0005074838,0.00420286],"genre_scores_gemma":[0.6929513,0.0002845849,0.3033225,0.00004753414,0.00001132396,0.0003123231,0.0002208935,0.00007034837,0.002779236],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.008868856,"threshold_uncertainty_score":0.01763445,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.05524105237403548,"score_gpt":0.2919254342536463,"score_spread":0.2366843818796108,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}