{"id":"W3108037149","doi":"10.1108/ecam-01-2020-0027","title":"An integrated BIM-based approach for cost estimation in construction projects","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":81,"is_retracted":false,"has_abstract":true,"ca_institutions":"Concordia University","funders":"","keywords":"Cost estimate; Agile software development; Process (computing); Estimation; Building information modeling; Computer science; Systems engineering; Cost engineering; TRACE (psycholinguistics); Scheme (mathematics); Industrial engineering; Reliability engineering; Risk analysis (engineering); Engineering; Software engineering; Operations management","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001047935,0.0003095963,0.0002409992,0.0004538264,0.00007336862,0.0001029184,0.0001514086,0.0001041835,0.00002202304],"category_scores_gemma":[0.0000257205,0.0003239896,0.00008101217,0.0007003587,0.00006947185,0.000272186,0.00001266332,0.0002858934,0.000004788089],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000178836,"about_ca_system_score_gemma":0.00002173998,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001008347,"about_ca_topic_score_gemma":0.000003979046,"domain_scores_codex":[0.9986588,0.00002966597,0.000425538,0.0003851528,0.0001838527,0.0003169784],"domain_scores_gemma":[0.999539,0.00002762848,0.00005857776,0.000189773,0.00005369804,0.0001313461],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004503139,0.00001032244,0.0002081311,0.000260264,0.00003389003,0.000001170624,0.0001252963,0.7638572,0.000842048,0.008159918,0.00001821449,0.2264386],"study_design_scores_gemma":[0.001039833,0.00007815482,0.0006835471,0.00005187457,0.00003092145,0.00003509776,0.0005450778,0.993652,0.002215853,0.0001468234,0.001174001,0.000346853],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.07114941,0.0000272603,0.9253631,0.0001209624,0.0006258627,0.001289525,0.00002370595,0.001046116,0.0003540167],"genre_scores_gemma":[0.6149518,0.000003591816,0.3843609,0.00003683766,0.00007485879,0.0003607913,0.000175283,0.0000340821,0.00000182853],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.5438024,"threshold_uncertainty_score":0.9999212,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01155896683256205,"score_gpt":0.2072388985586022,"score_spread":0.1956799317260401,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}