{"id":"W3156898704","doi":"10.1016/j.ifacol.2020.12.2858","title":"Collaborative supply chain planning and scheduling of construction projects","year":2020,"lang":"en","type":"article","venue":"IFAC-PapersOnLine","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Supply chain; Scheduling (production processes); Integer programming; IBM; Production planning; Computer science; Linear programming; Supply chain management; Operations research; Project management; Process management; Manufacturing engineering; Operations management; Production (economics); Systems engineering; Business; Engineering","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001681916,0.001190753,0.001331595,0.0009400375,0.0008650515,0.001969313,0.00173282,0.001417312,0.003527791],"category_scores_gemma":[0.002316543,0.0008705093,0.001231977,0.002152543,0.0008350318,0.001358034,0.001290325,0.001088805,0.0004371938],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001958148,"about_ca_system_score_gemma":0.003578774,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01476716,"about_ca_topic_score_gemma":0.01093462,"domain_scores_codex":[0.9983229,0.0006344948,0.0000769028,0.0003259577,0.0003591863,0.0002806099],"domain_scores_gemma":[0.9991067,0.000432291,0.0001452624,0.00007336256,0.0001307128,0.0001116776],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002176827,0.00001750832,0.0001676607,0.00002419967,0.00001198699,0.00004678411,0.00002674744,0.9890388,0.0001864076,0.00547436,0.0001502522,0.004833433],"study_design_scores_gemma":[0.000008671221,0.00002565229,0.00008687714,0.00000797791,0.00000831271,0.00001137143,0.00002293939,0.9936634,0.000220445,0.00501074,0.0009280908,0.000005444277],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03446583,0.000336636,0.9561281,0.0002090023,0.00004348011,0.0001849422,0.0001830389,0.0001361181,0.008312816],"genre_scores_gemma":[0.7959179,0.0008434568,0.1939932,0.00004477494,0.00004682463,0.0006157756,0.0004384019,0.00006303605,0.00803656],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01476716,"threshold_uncertainty_score":0.02936244,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.07845513194151653,"score_gpt":0.3529724922949883,"score_spread":0.2745173603534718,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}