{"id":"W3160179685","doi":"10.1049/gtd2.12205","title":"Value‐stack aggregator optimal planning considering disparate DERs technologies","year":2021,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"News aggregator; Distributed generation; Revenue; Computer science; Value proposition; Capacity planning; Energy planning; Environmental economics; Business; Renewable energy; Economics; Engineering; Finance; Marketing","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00112018,0.001247828,0.001303396,0.0008056621,0.0006859537,0.002139816,0.0008715313,0.001376161,0.003934867],"category_scores_gemma":[0.001949272,0.0008374534,0.0008999624,0.001071209,0.0007915711,0.001094602,0.001009474,0.001234853,0.0002927612],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002374685,"about_ca_system_score_gemma":0.002574687,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.03268159,"about_ca_topic_score_gemma":0.02606113,"domain_scores_codex":[0.9994992,0.0002151939,0.00001559297,0.00007357442,0.00008299859,0.0001134183],"domain_scores_gemma":[0.9990715,0.0005638692,0.00008876269,0.00002886334,0.0001611376,0.00008590983],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001042082,0.000006197723,0.00007337688,0.000005263251,0.000004713783,0.00001908787,0.000004317821,0.9980057,0.0000486083,0.0009162293,0.00008337328,0.0008226631],"study_design_scores_gemma":[0.00000500506,0.00001184472,0.00004480604,0.000002307175,0.000004111612,0.000002232994,0.000009774343,0.9988733,0.00004391788,0.0008807331,0.0001193025,0.00000262348],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3340296,0.001146414,0.5998627,0.00112628,0.0001258413,0.0004537733,0.001334027,0.0005144122,0.06140698],"genre_scores_gemma":[0.9689649,0.0002122105,0.02375333,0.00006588057,0.0000122309,0.000190081,0.000270327,0.0000380806,0.006492932],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.03268159,"threshold_uncertainty_score":0.06498271,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01901311604166536,"score_gpt":0.2296473393829213,"score_spread":0.2106342233412559,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}