{"id":"W3186564867","doi":"10.29173/mocs149","title":"BIM-Integrated Simulation of Construction Operations for Lean Production Management","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"National Research Foundation of Korea; Ministry of Science, ICT and Future Planning; National Research Foundation","keywords":"Procurement; Productivity; Schedule; Production (economics); Computer science; Plan (archaeology); Supply chain; Reliability (semiconductor); Lean manufacturing; Simulation modeling; Reliability engineering; Operations management; Engineering; Business","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008129253,0.0006517119,0.0005300393,0.0007386644,0.0005106817,0.001077988,0.0009071706,0.0007309901,0.005154806],"category_scores_gemma":[0.001281104,0.0004670635,0.0007761225,0.0008255313,0.0004404949,0.0008381862,0.0009648862,0.0006656227,0.0007259035],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008215002,"about_ca_system_score_gemma":0.001604469,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008460779,"about_ca_topic_score_gemma":0.008865483,"domain_scores_codex":[0.9996313,0.0001169084,0.00002626136,0.00003693711,0.0001432177,0.00004542311],"domain_scores_gemma":[0.9995609,0.0001738671,0.0000331933,0.00008607347,0.0001052228,0.00004072696],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004887148,0.00007880673,0.001286962,0.00003270561,0.00001295326,0.00004513895,0.00007614936,0.9812354,0.00152186,0.006757003,0.0006143761,0.00828976],"study_design_scores_gemma":[0.000006614744,0.00001033251,0.0001822243,0.000003765246,0.000003013696,0.000006513707,0.00001480898,0.99672,0.0007645029,0.001112647,0.00117132,0.000004174573],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1062496,0.0000938408,0.8671685,0.0002153878,0.00009858303,0.000196322,0.001389658,0.004009925,0.0205782],"genre_scores_gemma":[0.7503449,0.0002004284,0.2430746,0.00004563283,0.00001401825,0.0004038383,0.001679287,0.0002935111,0.003943681],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.008460779,"threshold_uncertainty_score":0.01724458,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01666541407334009,"score_gpt":0.2214036766618939,"score_spread":0.2047382625885538,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}