{"id":"W3199586433","doi":"10.1007/s11356-021-16285-0","title":"RETRACTED ARTICLE: Production scheduling of off-site prefabricated construction components considering sequence dependent due dates","year":2021,"lang":"en","type":"article","venue":"Environmental Science and Pollution Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":72,"is_retracted":true,"has_abstract":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Tardiness; Metaheuristic; Computer science; Scheduling (production processes); Differential evolution; Mathematical optimization; Job shop scheduling; Industrial engineering; Engineering; Algorithm; Schedule; Mathematics","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null}