{"id":"W4311212841","doi":"","title":"IMPLEMENTING A MIP MODEL TO PLAN AND SCHEDULE WOOD FINISHING OPERATIONS IN A SAWMILL: LESSONS LEARNED","year":2014,"lang":"fr","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"ca_institutions":"Université Laval","funders":"","keywords":"Schedule; Plan (archaeology); Computer science; Manufacturing engineering; Operations research; Operations management; Engineering; Operating system","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00134762,0.0008326838,0.000941909,0.0003009797,0.0004716597,0.001698267,0.001386544,0.001266578,0.004213355],"category_scores_gemma":[0.001996402,0.0008415526,0.00108217,0.0005467218,0.0003731445,0.001445673,0.0006104448,0.00175203,0.0006371101],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001194139,"about_ca_system_score_gemma":0.00313996,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02651147,"about_ca_topic_score_gemma":0.03123344,"domain_scores_codex":[0.999594,0.0001571457,0.00002288441,0.00006707308,0.00008540836,0.00007343895],"domain_scores_gemma":[0.9988855,0.0007278822,0.00004769968,0.00008070248,0.0001859978,0.0000722421],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003974361,0.00003429222,0.0002731181,0.00003578152,0.00001267244,0.00002274748,0.00002607728,0.9815603,0.0004863813,0.002071446,0.0004890791,0.01494841],"study_design_scores_gemma":[0.00001194702,0.00002425458,0.00006824016,0.000005802593,0.000007609383,0.000004663622,0.00002810036,0.9971494,0.0003038917,0.001768465,0.0006235334,0.000004084722],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.100732,0.0004948248,0.8822415,0.001406037,0.0001390277,0.0001744515,0.000494355,0.001345712,0.01297218],"genre_scores_gemma":[0.4572372,0.0004871674,0.5364876,0.0001609609,0.00004542636,0.0002184695,0.0004784535,0.0003219349,0.004562791],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.02651147,"threshold_uncertainty_score":0.05271429,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.03224664461875499,"score_gpt":0.260769636942165,"score_spread":0.2285229923234101,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}