{"id":"W4375867750","doi":"10.1061/jcemd4.coeng-13427","title":"Functionality as a Key Concept for Integrated Project Planning and Scheduling Methods","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Alberta","funders":"Agence Nationale de la Recherche","keywords":"Computer science; Scheduling (production processes); Two-level scheduling; Automated planning and scheduling; Planner; Dynamic priority scheduling; Industrial engineering; Systems engineering; Schedule; Engineering; Operations management; Artificial intelligence","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000346709,0.0001122013,0.0001588198,0.000364211,0.0000603382,0.00005807971,0.00003347823,0.00005244393,0.000005248143],"category_scores_gemma":[0.00003951518,0.0001041568,0.00004655041,0.0002471672,0.00003334296,0.0001693154,0.00001237353,0.0001364199,5.289717e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003439739,"about_ca_system_score_gemma":0.00001326765,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001692261,"about_ca_topic_score_gemma":1.446656e-7,"domain_scores_codex":[0.9993928,0.00001528047,0.0002897911,0.00009043723,0.00009380579,0.0001178814],"domain_scores_gemma":[0.9996881,0.00006297674,0.00006827927,0.00004694371,0.00008587119,0.00004781068],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008460181,0.000009029342,0.0003638889,0.0006917104,0.0007708348,0.00001539281,0.0007642636,0.3811838,0.004038026,0.07479002,0.001783235,0.5355052],"study_design_scores_gemma":[0.00214814,0.0002117534,0.002772269,0.0005565012,0.0002644024,0.001325119,0.006902259,0.7751433,0.002782841,0.003454663,0.203962,0.0004768192],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.08668875,0.0009723276,0.9096981,0.00008795533,0.00176094,0.0001983912,0.000004649059,0.0002168804,0.0003719932],"genre_scores_gemma":[0.4624963,0.001030795,0.5356843,0.00004292485,0.0004220462,0.0000677181,0.00001541266,0.00004722717,0.000193336],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.5350284,"threshold_uncertainty_score":0.4247392,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01921588944281504,"score_gpt":0.2899628841776272,"score_spread":0.2707469947348121,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}