{"id":"W4384433961","doi":"10.5220/0012004900003546","title":"Managing Trade-off Between Cost and Time in Project Scheduling Problems Using Discrete Event Simulation","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"ca_institutions":"McGill University","funders":"","keywords":"Discrete event simulation; Computer science; Scheduling (production processes); Job shop scheduling; Distributed computing; Real-time computing; Parallel computing; Embedded system; Simulation; Mathematical optimization; Routing (electronic design automation); Mathematics","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004196461,0.0008301554,0.00177622,0.001009519,0.0006434175,0.001797364,0.001633131,0.001548774,0.001834262],"category_scores_gemma":[0.009261237,0.001228924,0.0009078286,0.001051804,0.0008366526,0.001776901,0.001265942,0.001569506,0.0001134913],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001716222,"about_ca_system_score_gemma":0.001809044,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009573405,"about_ca_topic_score_gemma":0.008017184,"domain_scores_codex":[0.9985309,0.0008342118,0.00007193971,0.0001411138,0.0002327692,0.0001891464],"domain_scores_gemma":[0.9880908,0.01042986,0.0004968893,0.0002087965,0.0003428254,0.0004310251],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003808683,0.00003007015,0.0002297037,0.000009474587,0.0000122999,0.000008372905,0.000009722285,0.9967078,0.0001234345,0.001011389,0.00003123374,0.001788289],"study_design_scores_gemma":[0.000005045205,0.000007410951,0.00002946452,0.000001021335,0.000003252562,0.000001250034,0.000003919083,0.9992705,0.00005894486,0.0005941029,0.00002396237,0.000001078457],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2579119,0.0003317465,0.7357541,0.00051222,0.00007295897,0.0001455231,0.00009145365,0.0002673347,0.004912755],"genre_scores_gemma":[0.9387623,0.0001050342,0.05989689,0.00004265569,0.00001572029,0.00008814011,0.00005880453,0.00004136642,0.0009891692],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.009573405,"threshold_uncertainty_score":0.02219331,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.02779238895751512,"score_gpt":0.2757980651736847,"score_spread":0.2480056762161696,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}