{"id":"W4392456081","doi":"10.1061/9780784485231.017","title":"Simulation-Based Approach for Master Planning and Scheduling in Offsite Construction Supply Chain Management","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"ca_institutions":"Concordia University","funders":"","keywords":"Scheduling (production processes); Computer science; Supply chain management; Supply chain; Systems engineering; Operations management; Engineering; Business","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007299028,0.0005863332,0.0006268247,0.0007152355,0.0005697053,0.0009333289,0.0009992212,0.0007105664,0.002872165],"category_scores_gemma":[0.001217801,0.0005047127,0.0007437954,0.0005295431,0.0004899423,0.0007100932,0.0008804016,0.0006774505,0.0002895079],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001052314,"about_ca_system_score_gemma":0.001980555,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01419321,"about_ca_topic_score_gemma":0.01355617,"domain_scores_codex":[0.9995906,0.0001744294,0.00002208742,0.00006387746,0.00009831935,0.00005079852],"domain_scores_gemma":[0.9994972,0.000287534,0.00005636402,0.00004427955,0.00007588603,0.00003870759],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002456729,0.00001787788,0.0003588474,0.00001533177,0.00001211482,0.00002569552,0.00005200023,0.9878815,0.0008752081,0.003150757,0.0001047472,0.00748126],"study_design_scores_gemma":[0.000003095864,0.000007127665,0.00003654831,0.000002087535,0.000002522528,0.000002998984,0.000007245408,0.9987424,0.0002183408,0.0006380685,0.0003378052,0.000001858871],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02687008,0.00007045747,0.9685734,0.00006648005,0.00002240414,0.00009757286,0.00006848159,0.0006747415,0.003556323],"genre_scores_gemma":[0.7252939,0.0002069183,0.2710674,0.00003414948,0.00001829252,0.0003242484,0.0002115081,0.0001077453,0.002735903],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01419321,"threshold_uncertainty_score":0.02822119,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01586987261122653,"score_gpt":0.2300133138171805,"score_spread":0.214143441205954,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}