{"id":"W4410872146","doi":"10.5267/j.jpm.2025.5.001","title":"Optimizing stochastic multi-project scheduling with a simulation integrated multi-objective genetic algorithm","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Computer science; Genetic algorithm; Scheduling (production processes); Mathematical optimization; Algorithm; Mathematics; Machine learning","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.004216682,0.0004949352,0.0008625676,0.003961256,0.0003521141,0.0007701261,0.001230785,0.0001519842,0.00003085194],"category_scores_gemma":[0.001899163,0.0003375775,0.0003413727,0.004076607,0.0001862063,0.0006503887,0.0003498265,0.0007959845,0.00001936833],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004629592,"about_ca_system_score_gemma":0.0007353994,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008163743,"about_ca_topic_score_gemma":0.00002618282,"domain_scores_codex":[0.9940718,0.0006212694,0.001994492,0.0007992897,0.001895236,0.0006179275],"domain_scores_gemma":[0.9949284,0.001122488,0.001588941,0.0006462459,0.001600913,0.0001129692],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003788462,0.000290618,0.0003769341,0.0000453375,0.0006117485,0.0002232493,0.00346972,0.8184192,0.0000976015,0.00004585901,0.00007082096,0.1759701],"study_design_scores_gemma":[0.004387605,0.0004267427,0.001659623,0.0007391106,0.0003305947,0.00007953691,0.02804651,0.9629235,0.0001442552,0.0001759839,0.0006956764,0.0003908948],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.02755952,0.0004865983,0.9687801,0.0001013565,0.0005011953,0.001672581,0.000008471206,0.00006758666,0.0008225668],"genre_scores_gemma":[0.3001332,0.00002245018,0.6986793,0.0001143934,0.00008978457,0.00003068205,0.000001961983,0.0000330482,0.0008952278],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.2725736,"threshold_uncertainty_score":0.9999076,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.0832241558811624,"score_gpt":0.3970563660797415,"score_spread":0.3138322101985792,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}