{"id":"W4416307572","doi":"10.2139/ssrn.5764142","title":"Two-Stage 3D Lift Path Planning Method for Mobile Cranes in Industrial Modular Projects","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Lift (data mining); Modular design; Motion planning; Modular construction; Graph; Path (computing); Web crawler","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002871731,0.0005521596,0.0007573531,0.000649375,0.0004467089,0.0006261757,0.001019379,0.0007067018,0.005413322],"category_scores_gemma":[0.0004887102,0.0006349633,0.0008553789,0.0006079444,0.0003392932,0.0004992934,0.0008787451,0.0006589005,0.0007599555],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003694542,"about_ca_system_score_gemma":0.001251424,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009650436,"about_ca_topic_score_gemma":0.01348352,"domain_scores_codex":[0.9997407,0.0000380994,0.00001365068,0.000055605,0.0001192317,0.00003276543],"domain_scores_gemma":[0.9997892,0.00007902792,0.00001639655,0.00002522324,0.00007453547,0.00001570181],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001630672,0.00007814937,0.0008152474,0.0002696906,0.00004376423,0.0001384072,0.0002066041,0.7291907,0.01595844,0.007649938,0.001699938,0.243786],"study_design_scores_gemma":[0.000009941327,0.00003262873,0.0002032638,0.000009104336,0.00000782538,0.0000359918,0.00002015883,0.9956877,0.001792442,0.001099162,0.001092953,0.000008811149],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01087804,0.000052395,0.9870325,0.00002214946,0.00001515414,0.00005121164,0.0000637107,0.0003209314,0.001564003],"genre_scores_gemma":[0.3457221,0.0001557466,0.6484444,0.00002743534,0.00001385878,0.000264204,0.0002690137,0.0001714831,0.00493186],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.009650436,"threshold_uncertainty_score":0.01918852,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.02283570847760669,"score_gpt":0.2993323525323262,"score_spread":0.2764966440547195,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}