{"id":"W4416832861","doi":"10.48550/arxiv.2507.12327","title":"Mixed-integer Second-Order Cone Programming for Multi-period Scheduling of Flexible AC Transmission System Devices","year":2025,"lang":"en","type":"preprint","venue":"ArXiv.org","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"ca_institutions":"Hydro-Québec; Polytechnique Montréal","funders":"","keywords":"AC power; Electric power system; Flexible AC transmission system; Grid; Transmission system; Scheduling (production processes); Alternating current; Voltage; Renewable energy","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00212159,0.001818856,0.001472005,0.0005143963,0.00045784,0.001966452,0.001091587,0.0009844786,0.003957749],"category_scores_gemma":[0.002650312,0.0007280257,0.001032153,0.0009529263,0.0007493318,0.0007761007,0.0008822544,0.002019931,0.0004950424],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001584853,"about_ca_system_score_gemma":0.002793048,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0123267,"about_ca_topic_score_gemma":0.01118032,"domain_scores_codex":[0.9990107,0.0005016827,0.00002775883,0.0001044347,0.0002037184,0.0001516253],"domain_scores_gemma":[0.9980741,0.001297404,0.0002060028,0.00005177771,0.0002508256,0.0001199667],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002370614,0.0000236655,0.00008559301,0.00003546982,0.000008260547,0.0000389033,0.00001465815,0.9922122,0.0001642202,0.004497198,0.0004353231,0.002460859],"study_design_scores_gemma":[0.000004324103,0.0000152237,0.00001911472,0.000003352174,0.000001464892,0.000002832629,0.000005403408,0.9985784,0.00004153502,0.001167087,0.00015966,0.000001532096],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.02021287,0.0006604656,0.9666732,0.0003897948,0.00009142043,0.0001839079,0.0003263411,0.0002236988,0.0112383],"genre_scores_gemma":[0.7895555,0.001121306,0.1965452,0.0002498285,0.00008483215,0.0007820315,0.0006684934,0.0002053394,0.01078755],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.0123267,"threshold_uncertainty_score":0.02450991,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.04761456477439482,"score_gpt":0.2860660781523449,"score_spread":0.23845151337795,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}