{"id":"W7104536005","doi":"10.1115/1.4070141","title":"Application of a Fuzzy Decision Support System for Project Risk Management in Rail Transportation Infrastructure","year":2025,"lang":"en","type":"article","venue":"ASME Open Journal of Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Scope (computer science); Fuzzy logic; Risk management; Decision support system; Schedule; Adaptability; Risk assessment; Cost contingency; Fuzzy rule; Contingency plan","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002941004,0.0006045532,0.0005483083,0.001422497,0.0006474365,0.001749444,0.0009618519,0.0008410247,0.003659787],"category_scores_gemma":[0.007928432,0.0002575164,0.0006549063,0.000606597,0.0003385589,0.0009771084,0.0009554214,0.0006179255,0.0004136086],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001357202,"about_ca_system_score_gemma":0.001337057,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007651911,"about_ca_topic_score_gemma":0.005253922,"domain_scores_codex":[0.9989113,0.0003873993,0.0001179794,0.000191678,0.0003257625,0.00006585458],"domain_scores_gemma":[0.9959471,0.002523218,0.0002489363,0.0002264251,0.0008963094,0.0001580923],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001063147,0.0005510637,0.008892056,0.0002840577,0.0001541228,0.0005358896,0.0007868891,0.6359689,0.01227925,0.01144613,0.002860896,0.3251776],"study_design_scores_gemma":[0.00003749432,0.0001069698,0.0005363047,0.00002563593,0.00002460763,0.00003510127,0.00005974595,0.9932342,0.002260338,0.002603416,0.001057239,0.00001883777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1647364,0.0001304082,0.8265382,0.0004792187,0.00008704211,0.0004152946,0.0003829929,0.002409397,0.004821053],"genre_scores_gemma":[0.7477971,0.00006971936,0.2506565,0.00008030888,0.00002032131,0.000183035,0.0001624123,0.0000300194,0.00100058],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.007651911,"threshold_uncertainty_score":0.01555365,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.02036737403764493,"score_gpt":0.3385779581561329,"score_spread":0.318210584118488,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}