{"id":"W7106154820","doi":"10.2316/j.2026.203-0641","title":"TCN-DBN HYBRID FRAMEWORK FOR SHORT-TERM PROBABILISTIC LOAD FORECASTING AND RISK QUANTIFICATION IN POWER SYSTEMS","year":2025,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"ca_institutions":"","funders":"","keywords":"Probabilistic logic; Electric power system; Probabilistic forecasting; Electrical network; Power (physics); Probabilistic risk assessment; Load management","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005726066,0.0001585186,0.0002751576,0.0002425858,0.00004179308,0.0002188145,0.0001745628,0.00009801531,0.000001957908],"category_scores_gemma":[0.0002480797,0.0001494959,0.00006509149,0.0000946679,0.00003412979,0.0002402115,0.00002817977,0.0001827633,4.569407e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002957959,"about_ca_system_score_gemma":0.00004642302,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00009001417,"about_ca_topic_score_gemma":0.00001251072,"domain_scores_codex":[0.9986284,0.00004594978,0.0007083931,0.0001637707,0.0002789703,0.0001745536],"domain_scores_gemma":[0.9989598,0.0002490866,0.0001723283,0.0001018461,0.000451052,0.0000658702],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0009058748,0.0003559395,0.09542046,0.001189623,0.002492476,0.0002058017,0.001658928,0.63236,0.002940274,0.2450543,0.003970205,0.01344604],"study_design_scores_gemma":[0.00178555,0.0003159035,0.02137734,0.004034925,0.0001758588,0.0007525129,0.0008700342,0.9507576,0.0004326556,0.00361115,0.01528469,0.0006017937],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4660523,0.004924213,0.5220463,0.00004835934,0.005978425,0.0001415067,0.0001088206,0.00003087438,0.0006691066],"genre_scores_gemma":[0.9991693,0.0002668036,0.0003203456,0.000006197549,0.0001278972,0.00002572373,0.00001637113,0.0000173977,0.00004990429],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.533117,"threshold_uncertainty_score":0.6096267,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01299623904255078,"score_gpt":0.2518121907931631,"score_spread":0.2388159517506123,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}