Assessing the effectiveness of static heuristics for scheduling lumber orders in the sawmilling production process

2024· article· en· W4395026711 on OpenAlexaff
Francisco Vergara, Cristian D. Palma, John D. Nelson

Bibliographic record

VenueMaderas Ciencia y tecnología · 2024
Typearticle
Languageen
FieldEngineering
TopicAssembly Line Balancing Optimization
Canadian institutionsWestern Forest Products
Fundersnot available
KeywordsHeuristicsScheduling (production processes)Computer scienceProcess (computing)Production (economics)Industrial engineeringMathematical optimizationEngineeringMathematicsEconomicsMicroeconomics

Abstract

fetched live from OpenAlex

Although optimization models can be used to plan the production process, in most cases static heuristics, such as earliest due date (E), longest processing time (L), and shortest processing time (S), are used because of their simplicity. This study aims to analyze the production cost of the static heuristics and to determine how this cost relates to the size of the production orders in the sawmilling industry. We set a planning problem with different orders and due dates and solved it using two cost-minimization models to compare their solutions. The first was a planning model (PL) where orders were split up into products demand by period, and the second, a planning scheduling (PS) where the sequence of processing orders based on static heuristics was assumed as known. In the latter, the minimum production cost for each static heuristic was found. In both models, the same resource constraints were assumed. The costs showed no significant changes based on order sizes. However, 0,5 % of orders were delayed using PS-E, and 17 % of orders were delayed using PL. PL was an efficient solution method when changing the orders´ size and when looking for the best static heuristic to process the orders. However, PS-E showed the ability to reduce the backlog close to zero while the PL backlog ratio was 17 %. No penalties were applied to backlogs due to their subjective nature; however, when shortages occurred, the demand was unmet or backlogged with substantial costs. Thus, in case the proposed method is adopted using a conservative backlog cost, a sawmill producing under the cut-to-order environment that produces 300000 m3 /year would reduce backlogged orders by 51000 m3. If the holding lumber cost is 2 $/m3, annual savings would be $408000.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.004
metaresearch head score (Gemma)0.012
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.024
Threshold uncertainty score0.048

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0040.012
Meta-epidemiology (narrow)0.0020.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0020.002
Science and technology studies0.0010.001
Scholarly communication0.0020.002
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.015
GPT teacher head0.302
Teacher spread0.287 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2024
Admission routes1
Has abstractyes

Explore more

Same venueMaderas Ciencia y tecnologíaSame topicAssembly Line Balancing OptimizationFrench-language works237,207