Incorporating User Delay Cost in Project Selection: A Canadian Case Study
Notice bibliographique
Résumé
Multi-million dollar contracts, economic impact on industries and public satisfaction are factors agencies, dealing with transportation infrastructure, must deal with regularly. It is clear that construction is necessary to maintain or upgrade the current roadway infrastructure in Canada. The long-term result is a smooth, comfortable and safe road for motorists. Short-term effects, especially to the traveling public, will be difficult, primarily through delays and an increase in vehicle operating costs. Determination of such costs may be performed at the project level. However, this information is rarely implemented into the selection of the best alternative treatment, leading to potential disaster to the traveling public at the onset of construction. The cost of delays associated with freeway repairs and upgrades is typically borne by the motorists themselves. As a means of alleviating public frustration, the costs that have been relegated to the public are being incorporated into the project selection. This will allow the agency to select an alternative that will be economically feasible with minimized public impact. The purpose of this study is to analyze the user delay cost not only during construction on an existing facility, but the delays caused by routine maintenance activities. A computer model
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».