Activity Overlapping Assessment in Construction, Oil, and Gas Projects
Notice bibliographique
Résumé
Increasing demand for project completion in a shorter duration has led to various methods of schedule compression techniques, that a well known among them is fast tracking that refers to overlapping activities that normally would be done in sequence. Fast tracking (overlapping) can reduce the execution time of a project while at the same time can result in rework, extra costs and increased risks as evident by many construction projects. In order to limit the risks of fast tracking and to gain maximum advantage, a tradeoff between benefits and losses of activity overlapping is required. Such a tradeoff requires a systematic and practical approach. For this purpose an analysis has been conducted over the inherent nature of overlapping to develop a new framework for optimizing activity overlapping in construction projects. The main objective of this paper is to introduce such a framework and the hypothesis behind it. The paper will also include the theoretical justification of the suggested framework to verify that the framework can be both reliable and practical to be used by project managers to find the optimum overlapping between activities to reduce the negative risks including sources of cost overruns and time delays.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,002 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,001 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,001 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,001 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».