MétaCan
Menu
Retour à la cohorte
Enregistrement W2053413178 · doi:10.2118/137428-ms

Successful Use of Managed Pressure Drilling (MPD) to Counteract Loss Circulation and HP Gas Zones: A Case Study from Red Rock South Wapiti Field in Grande Prairie, Alberta, Canada

2010· article· en· W2053413178 sur OpenAlexaffabout
Hassan. K. Malik, Raymond. J. Litwin, Bernard. C. Jones

Notice bibliographique

RevueCanadian Unconventional Resources and International Petroleum Conference · 2010
Typearticle
Langueen
DomaineEngineering
ThématiqueDrilling and Well Engineering
Établissements canadiensConocoPhillips (Canada)
Organismes subventionnairesnon disponible
Mots-clésDrillingCasingPetroleum engineeringLost circulationDrillDrilling fluidUnderbalanced drillingCompletion (oil and gas wells)Mining engineeringDrill pipeDrilling engineeringNatural gas fieldCrewEngineeringNatural gasMechanical engineeringWaste managementAeronautics

Résumé

récupéré en direct d'OpenAlex

Abstract Heavy Mud Weight (MW) to control HP gas and Loss Circulation zones at the same time is not something operators look forward to. COP's Red Rock field in South Wapiti, Alberta had been a victim of this combination which resulted in high operational costs primarily due to additional casing string, high MW and severe mud losses. On average, AFE's came at a minimum of 20% higher as anticipated bringing the drilling program of the area to being uneconomic. A review of MPD technology with the team created a spark to look at improving performance in the area. A number of objectives were identified for this project which were later categorized as Primary Objectives. Drill to TD with reduced mud weights (MW) in a safe manner Set the intermediate casing on top of HP gas zones utilizing wellbore strengthening Drill ahead into HP zones without any massive mud losses Bring the cost of the wells down in order to save the drilling program of the area Eliminate the Intermediate Casing for a significant cost reduction in future wells Secondary Objectives. Conduct Real Time Formation Evaluation in some formations to verify their potential Increase ROP Cement the Intermediate Casing using a single stage method Assess and evaluate the benefits of a new technology Rig crew training and changes in HSE concepts for an MPD operation A dedicated Engineering team was formed who worked on data collection, research of the area, drilling practices and well engineering. This team was supported by COP's experienced Operations team. A great deal of up front discussion and work was done in planning this project to ensure success. Several well design scenarios were looked at the very initial phase of project, out of which the best design in terms of well engineering, well control, area's known risks and HSE was chosen. During this process COP's engineering team introduced "Fountain Chart Method" which uniquely identifies operating envelope of an MPD operation using optimum mud weights From the initial design the specifications of the MPD equipment were decided upon. A meticulous work was conducted on Process Flow Diagrams (PFDs) of which Well Control was of pivotal importance. Special training was assigned to the rig crew detailing goals of the project, working of MPD equipment and communication skills in the presence of another vendor on site. The HSE alert level was heightened due to the sensitivity of the project and extra emphasis was given on safety meetings highlighting high pressure lines, communication skills and drilling with wellhead pressure on surface. Promising results were seen in a four well campaign which not only brought the cost of the wells down but also made the wells more economic. The lower cost of the wells were a result of an improved ROP in some sections and the replacement of a full intermediate string coupled with a liner with only a single production casing string from surface to TD. An added benefit is the technology helped in studying the formations at low MW which were previously masked due to heavy MWs. Utilizing Wellbore Strengthening (WBS) was also a key in establishing integrity of weaker zones up hole. This in turn, gave a better window of applying surface choke pressures using MPD auto choke system. The success of these wells has led to further implementation in the Canadian BU. As a result, a screening tool was developed for internal review of candidates/fields that may benefit from MPD, UBD or any other unconventional style of drilling (such as Air, Aerated Mud or Foam etc). A process is underway in assessing the benefits of these technologies in COP's drilling portfolio and ways are being looked at in making an effective process for implementing these sorts of high profile projects in the future

Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.

Comment cette classification a été obtenuedéplier

Prédiction distillée sur la base complète

Imitation des enseignants

Ni prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.

score de la tête « metaresearch » (Codex)0,000
score de la tête « metaresearch » (Gemma)0,000
Version: codex-gemma-dda1882f352aStatut de validation: machine_predicted_unvalidated
Catégories candidatesaucune
Catégories consensuellesaucune
DomaineSignal candidat: aucune · Signal consensuel: aucune
Devis d'étudeSignal candidat: Simulation ou modélisation · Signal consensuel: aucune
GenreSignal candidat: Empirique · Signal consensuel: Empirique
Score de désaccord entre enseignants0,547
Score d'incertitude au seuil0,762

Scores Codex et Gemma par catégorie

CatégorieCodexGemma
Métarecherche0,0000,000
Méta-épidémiologie (sens strict)0,0000,000
Méta-épidémiologie (sens large)0,0000,000
Bibliométrie0,0000,000
Études des sciences et des technologies0,0000,000
Communication savante0,0000,000
Science ouverte0,0000,000
Intégrité de la recherche0,0000,000
Charge utile insuffisante (le modèle a refusé de juger)0,0000,000

Scores machine (provisoires)

Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.

Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.

Tête enseignante Opus0,010
Tête enseignante GPT0,200
Écart entre enseignants0,190 · la distance entre les deux têtes enseignantes sur ce seul travail
Statut de validationscore_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découle

Classification

machine, non validée

Prédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.

Les modèles n’ont appliqué aucune catégorie : rien dans la taxonomie ne correspondait à ce travail.
Devis d'étudeSimulation ou modélisation
Domainenon disponible
GenreEmpirique

Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».

En bref

Citations6
Publié2010
Routes d'admission2
Résumé présentoui

Explorer davantage

Même revueCanadian Unconventional Resources and International Petroleum ConferenceMême sujetDrilling and Well EngineeringTravaux en français237 207