Economic Considerations for the Design of In-Situ Combustion Projects

2000· article· en· W2056228497 sur OpenAlexaffabout
J. Nodwell, R.G. Moore, M.G. Ursenbach, C.J. Laureshen, S. A. Mehta

Notice bibliographique

RevueJournal of Canadian Petroleum Technology · 2000
Typearticle
Langueen
DomaineChemistry
ThématiquePetroleum Processing and Analysis
Établissements canadiensUniversity of Calgary
Organismes subventionnairesnon disponible
Mots-clésCombustionWork (physics)Environmental scienceIn situEnhanced oil recoverySteam injectionProcess engineeringProcess (computing)Waste managementEngineeringComputer scienceMechanical engineeringChemistry

Résumé

récupéré en direct d'OpenAlex

Abstract Recent technical advances in the understanding of in-situ combustion have made it worthwhile to consider this process as a serious means of recovering heavy oil. However, it must first prove itself to be economically viable, particularly in comparison with steam based recovery processes. This paper examines the factors that are necessary to make in situ combustion work in the field, including the need to ensure operation at high temperatures, optimal well layouts and spacing, and why economies of scale must be used to ensure competitive economics. Based on these requirements, an in-situ combustion process is then compared to a similarly designed steam process and the comparative economics are discussed. The results of this work show that in situ combustion should be laid out in a line drive pattern, based on a 4 ha (10 acres) well spacing. Sufficient air injection capacity must be installed to best ensure high temperature combustion, thus achieving reasonable oil production rates. It is recognized that in-situ combustion has higher front end costs than steam processes, but recovery factors for in-situ combustion can be as much as 60% higher. The cost comparison for a 20 well combustion project and a comparable steam project set in Western Canada yields a per m3 cost of $104.10 for steam and $78.00 for in situ combusiton ($16.55 for steam and $12.40 for in-situ combustion). Introduction As with any investment, the major concern with in-situ combustion (ISC) is the risk and the competitive return, since it is a relatively costly supplementary recovery process. The major economic consideration is risk, as in the past, this complex process has exhibited an uninspiring lack of success. It has been tried in dozens of projects over the past 40 years, but has not accounted for and still does not account for significant heavy oil production anywhere in the world(1). This paper will focus on the fire flooding of heavy oil in Western Canada, where the competing process is steam injection. In hindsight, thanks to research at the University of Calgary and elsewhere, the reasons for this lack of success are understandable. In-situ combustion is far more complex than was originally thought, and it is not intuitive that there would be multiple oxidation reactions with uneven transitions. This dynamic displacement process is highly technical, with low temperature oxidation (LTO), high temperature oxidation (HTO) and gas phase combustion intertwined with complex organic reactions, and it is influenced by temperature and oxygen partial pressure. Also, it is possible to now benefit from the considerable amount of field experience gained on the unsuccessful projects. If properly operated, the process does not produce difficult emulsions nor does it increase oil gravity or viscosity; all problems which have been associated with in situ combustion in Canadian heavy oil. The economic driving force behind in-situ combustion has always been the potential of a higher oil recovery than is possible from other processes. Estimates show that the capital cost of using ISC for an average Canadian heavy oil project is approximately equal to that of a steam based process (dependent, of course, on a number of variables);

Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.

Comment cette classification a été obtenuedéplier

Prédiction distillée sur la base complète

Imitation des enseignants

Ni prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.

score de la tête « metaresearch » (Codex)0,000
score de la tête « metaresearch » (Gemma)0,000
Version: codex-gemma-dda1882f352aStatut de validation: machine_predicted_unvalidated
Catégories candidatesaucune
Catégories consensuellesaucune
DomaineSignal candidat: aucune · Signal consensuel: aucune
Devis d'étudeSignal candidat: Expérimental (laboratoire) · Signal consensuel: Expérimental (laboratoire)
GenreSignal candidat: Empirique · Signal consensuel: Empirique
Score de désaccord entre enseignants0,335
Score d'incertitude au seuil0,950

Scores Codex et Gemma par catégorie

CatégorieCodexGemma
Métarecherche0,0000,000
Méta-épidémiologie (sens strict)0,0000,000
Méta-épidémiologie (sens large)0,0000,000
Bibliométrie0,0010,000
Études des sciences et des technologies0,0000,000
Communication savante0,0000,000
Science ouverte0,0000,000
Intégrité de la recherche0,0000,000
Charge utile insuffisante (le modèle a refusé de juger)0,0000,000

Scores machine (provisoires)

Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.

Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.

Tête enseignante Opus0,019
Tête enseignante GPT0,233
Écart entre enseignants0,214 · la distance entre les deux têtes enseignantes sur ce seul travail
Statut de validationscore_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découle

Classification

machine, non validée

Prédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.

Les modèles n’ont appliqué aucune catégorie : rien dans la taxonomie ne correspondait à ce travail.
Devis d'étudeExpérimental (laboratoire)
Domainenon disponible
GenreEmpirique

Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».

En bref

Citations16
Publié2000
Routes d'admission2
Résumé présentoui

Explorer davantage

Même revueJournal of Canadian Petroleum TechnologyMême sujetPetroleum Processing and AnalysisTravaux en français237 207