Abstract This paper describes logistic sea lift arrangements and receiving marine terminal solutions for Newmont's Hope Bay Gold Mine Project in the Canadian Arctic. Presented in this case study are innovative design features and logistical sea lift strategies to overcome significant obstacles for a major Arctic development project. Supplying a major Arctic mine start up project in Western Nunavut in 2010 with thousands of tons of supplies and construction materials is a major challenge when there is adequate time to plan the logistics and construct a proper receiving marine terminal. Compounding this major challenge is an extremely aggressive schedule and an existing marine terminal originally designed for much smaller vessels. The project sea lift strategy included both the typical West Coast supply route and, for the first time, East Coast supply routes using both the Northwest Passage and Panama Canal. This paper provides a discussion of the advantages of staging a major sea lift using the Northwest Passage that links both west and East Coast seaports of the United States and Canada to the Arctic. Details are included about temporary and permanent structural improvements to an existing marine terminal to support the sea lift and how an innovative sheet pile dock design technology and advanced winter construction techniques can accelerate the completion of a remote Arctic marine terminal by one year. Introduction The Newmont sea lift of 2010 executed from eastern Canada included a 3,000 nautical mile route for the first time up the icy straights of the Northwest Passage and set a record long 11,000 nautical mile tow through the Panama Canal (see Figure 1). The sea lift circumnavigated the North America Continent and accomplished a major logistical feat to kick off the Hope Bay Gold Mine project. The Newmont sea lift of 2010 was organized, planned and executed under a very aggressive schedule, resulting in the timely arrival of over 10,000 tons of supplies and equipment and, 17 million liters of fuel. The sea lift required the support of 14 different vessels, over 350 logistics personnel and utilized nine different ports in US and Canada on both the East and West Coast. Final planning and design for the sea lift and the components that needed to be transported, did not begin in earnest until October 2009. This schedule meant only 10-months for the design, procurement and fabrication of the required project components to meet the shipping date to the Arctic. In addition to this, the existing marine facilities at the site were never designed for large capacity ocean going vessels such as the ones required for the sea lift. The time element did not allow for conventional structural upgrades and marine facilities expansion, but instead required quick turnaround band-aid type solutions that could be implemented before the sea lift arrived. Major marine structural upgrade and expansion work had to be deferred until the following year.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».